project management - Management
assignment should be done in MSExcel sheet and please watch the uploaded video for the guidelines and how the assignment should be done.
Also please check the document uploaded it is part 1 of the assignment " Renovation of library" 
Note: i need 35 risks that cause while Renovating a library in Surry. Surry is a location in British colombia, canada.
RBS
..... Project
1.External
2.Organizational
3.Operational
4.Project Management
1.1.Owner / Client 
1.2.Sub-Contractors
1.3.Vendors
1.4.Natural Enviromental
2.1.Project Team
2.2.Resource Including Human Resource
2.3.Funding & Budgeting
2.4.Culture
3.1.Requirement / Scope
3.2.Technology Availability
3.3.Complexity 
3.4.Quality 
4.1.Planning & Estimating
4.2.Control & Monitoring
4.3.Communication
4.4.HSE
1.5.Market / Economy 
3.5.Performance & Reliability
1.6.Political Condition 
2.5.Location 
2.6. Expriences 
3.6.Technology Limits
4.5.Contract
3.7.Design
3.8.Change 
3.9.Interface 
3.10.Supply 
3.11.Construction 
Instructions
 General Tips
 1.      Utilize the drop down menus when available to keep things consistent
 2.      Use “Alt + Enter” to place a hard return within a cell.  Using a hyphen “-“ as a bullet at the beginning of text along with a hard return at the end of text helps keep information organized when there is more than one response plan or owner.
  Description of risk Register column.  Helpful Hints for risk Assessment
 No.: Identification number of each risk.    Once risks are identified, they should be given a unique identification number, beginning with 1.
 Date ID: The date that the risk was originally identified and included in the risk register.
 Date Updated:   The date that the risk was last updated in the risk register.
 Project: The name of the project.    The name used should be consistent for each project.
 Category: The primary category or functional area that the risk pertains to.    Generally, the risk breakdown structure is a way of categorizing or grouping risks by the potential cause of the risk.
 SubCategory The second level of the RBS.    The RBS Group 2 is a more detailed grouping of a particular risk than RBS Group 1.
 Opportunity/Threat:
 Opportunity Risk identified as an opportunity in the assessment section of the risk register
 Threat Risk identified as a threat in the assessment section of the risk register
 Opp./Threat Risk identified as an opportunity and a threat in the assessment section of the risk register
 Summary Description: Brief, generally unique description of the risk specific to the Project  In the identification process, think about risks relevant to the project scope, schedule, or cost.  Additionally think of risks that may impact the agency's reputation.
 Detailed Description: Detailed description of the risk, generally including a "cause", possible "risk event", and "effects".  The goal is to ensure that other users of the register can interpret the risk identified.  Try to be specific and not overly vague.  Sample risk statement templates are "If <uncertain event> --> then <effect on objectives>." or "Due to <definite cause>, <uncertain event> may occur, resulting in <effect on objectives>.
 Probability: A rating on a scale of 1 through 5 indicating the likelihood that a risks will occur based on current requirements or conditions.  See "Opportunity - Rating Desc." and "Threat - Rating Desc." tabs.
 Project Impact (pre-response): Impacts to project objectives of quality, cost, and time.  The pre-response rating is based on current requirements or conditions, prior to the response plan being implemented.    See "Opportunity - Rating Desc." and "Threat - Rating Desc." tabs for general rating definitions to be used as guidance; however this is also subject to judgment of the project team.  
 Severity (P): The product of the probability and the highest rated project risks impact
 Agency Impact (pre-response): Impacts to MnDOT's goals of safety, connectivity, congestion, and best-in-class agency (reputation, public perception, etc...).  The pre-response rating is based on current requirements or conditions, prior to the response plan being implemented.    See "Opportunity - Rating Desc." and "Threat - Rating Desc." tabs for general rating definitions to be used as guidance; however this is also subject to judgment of the project team.
 Severity (A): The product of the probability and the highest rated agency risks impact
 Severity (max): The absolute value of the highest rated project and agency risks severity value - used primarily for sorting and normally hidden in reporting.
 Probability: The estimated likelihood in percent (%) of the risk occurring based on current state of the risk.  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated probability at the time of assessment.
 Minimum (Cost) The estimated minimum cost impact of the risk if it were to occur (in millions of Euros).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
 Most Likely (Cost): The estimated most likely cost impact of the risk if it were to occur (in millions of Euros).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assements as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
 Maximum (Cost) The estimated maximum cost impact of the risk if it were to occur (in millions of Euros).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
 Minimum (Schedule) The estimated minimum schedule impact of the risk if it were to occur (in months).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
 Most Likely (Schedule): The estimated most likely schedule impact of the risk if it were to occur (in months).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
 Response Category:
 Opportunity or Threat Response - Pick One
 Accept Indicates that the project team has decided not to change the project plan to deal with a risk, or is unable to identify any other suitable response strategy.  It should be noted, that mitigation or transference is not necessary for all risk threats, particularly those with a small severity rating.  Judgment must be used as to whether a more rigorous (and potentially costly) response should be implemented.  If accept is chosen as the response, generally the pre- and post-response assessment ratings remain the same.
 Share Allocates a portion of ownership of a risk threat to another party who is best able to minimize the impact and/or probability of the risks.
Allocates all or a portion of ownership of a risk opportunity to another party who is best able to maximize its probability of occurrence and increase the potential benefits if it does occur.  MnDOT and 3rd party share the benefits of the opportunity.
 Threat Response
 Mitigate Seeks to reduce the probability and/or impact of a risks threat to below an acceptable threshold.  If mitigate is chosen as the response, generally the post response assessment is lower than the pre-response assessment.
 Transfer Allocates all ownership of a risk threat to another party who is best able to minimize the impact and/or probability of the risk.  If transfer is chosen as the response, generally the post response assessment is lower than the pre-response assessment.  If the risk is fully transferred with no residual risk to MnDOT, the post-response assessment would equal zero.  However, it is important to think about the cost of transferring the risk, which can be captured in the "Response Cost" column.
 Avoid Involves changing the project plan to eliminate the risk threat or to protect the project objectives from its impact.   If avoid is chosen as the response, generally the risk is totally eliminated in the post response assessment.
 Opportunity Response
 Enhance Seeks to modify the “size” of a risk opportunity by increasing its probability and/or impact thereby maximizing benefits realized for the project.
 Exploit Seeks to eliminate the uncertainty associated with a particular upside risk by making the risk opportunity definitely happen - can be considered a more rigorous response than "enhance".
 Urgency: Rating of "High", "Medium", or "Low" in regards to when the risk needs to be addressed.
 Project Impact (post-response): Impacts to project objectives of quality, cost, and time.  The post-response rating is the residual risk assuming the response plan has been implemented properly.  See "Opportunity - Rating Desc." and "Threat - Rating Desc." tabs for general rating definitions to be used as guidance; however this is also subject to judgment of the project team.  These cells come prepopulated with values from the pre-response to assist with data entry in the post-response evaluation.  The prepopulated values (formulas) should be overwritten with new ratings of 1 through 5 taking into account the response plan.  If the response is to accept, the values would remain the same as the pre-response.
 Severity (P): The product of the probability and the highest rated project risk impact
 Agency Impact (post-response): Impacts to MnDOT's goals of safety, connectivity, congestion, and best-in-class agency (reputation, public perception, etc...).  The post-response rating is the residual risk assuming the response plan has been implemented properly.  See "Opportunity - Rating Desc." and "Threat - Rating Desc." tabs for general rating definitions to be used as guidance; however this is also subject to judgment of the project team.  These cells come prepopulated with values from the pre-response to assist with data entry in the post-response evaluation.  The prepopulated values (formulas) should be overwritten with new ratings of 1 through 5 taking into account the response plan.  If the response is to accept, the values would remain the same as the pre-response.
 Severity (A): The product of the probability and the highest rated agency risk impact
 Severity (max): The absolute value of the highest rated project and agency risk severity value - used primarily for sorting and normally hidden in reporting.
 Priority Priorities are either "high", "medium", or "low".
- High priorities are generally items that require immediate action or discussions at a higher level than the project team.
- Medium priorities are generally items that are being actively addressed or monitored by the proiect team.
- Low priorities are identified items that are not being actively addressed or monitored, but are desired by the project team to remain on the register in the event that conditions change on the project.
 Response: Primary plan to address the risk.  Response plans should be specific enough to implement.  It is okay to include steps to implementation.  For example further study may be needed prior to implementing a response plan to determine whether it would be effective; or options may need to be evaluated and decided upon by the project team prior to implementation.  Owners assigned are those who are best able to monitor the risk and implement the response.  More than one owner can be assigned, but it should be clear what each owner is responsible for.
 Risk Owner: Person or people assigned to implement the response plan and monitor the risk.    If multiple people are assigned as owners, it should be clear what each of their roles are and what they are individually responsible for.
 Trigger(s): Description of events that may serve as indicators that a risk has occurred or is about to occur.  Triggers help in monitoring the risk.  Identification of triggers is recommended, but may not be applicable in all cases.  Think about potential risk triggers and list them if they apply.  Triggers are not absolutely necessary for all risks, but are useful in monitoring.  They are indications that the risk is about to occur or has occurred.
 Contingency Plan: For risks, this is the plan to address  if the risk threat were to occur.  Contingency plans allow for agreement of the plan in advance so that the plan can be implemented more efficiently in order to reduce impacts.  Developing contingency plans is recommended, but may not be applicable in all cases.  Determine whether a contingency plan would be beneficial.  Not all risks need a contingency plan but they are helpful for when a risk event does occur or the primary plan fails so there is a rough plan in place to put into action.
 Response Cost: Cost of the response plan as provided in the risk register for cost estimating purposes.  This cost may be shown as negligible if it is reasonable to assume the costs can be absorbed into other project activities.  Estimating response cost is recommended, but may not be applicable in all cases.
 Agency Risk (X): Automated box that includes an "X" for risks that are identified with Agency impacts.
 Cost Impacts (X): Automated box that includes an "X" for risks that are identified with cost impacts.  If performing the quantitative assessment, this box is an indicator that cost impacts (in millions of dollars) should be entered in cells AS through AU.
 Schedule Impacts (X): Automated box that includes an "X" for risks/issue that are identified with schedule impacts.  If performing the quantitative assessment, this box is an indicator that schedule impacts (in months) should be entered in cells AV through AX.
 Maximum (Schedule) The estimated maximum schedule impact of the risk if it were to occur (in months).  For the initial risk assessment, this value should generally correlate with the pre-response assessment.  For subsequent risk assessments as response plans are implemented, the value should reflect the estimated impact at the time of assessment.
  Cost Impact  The adjusted cost impacts of the risk (in millions of dollars) taking into account the probability and the minimum, most likely, and maximum cost impacts.   The equation used is the product of the probability and weighted average of the minimum, most likely, and maximum values.
(probability (%) * (minimum + 4*most likely + maximum)/6))
 Schedule Impact  The adjusted schedule impacts of the risk (in weeks) taking into account the probability and the minimum, most likely, and maximum cost impacts.   The equation used is the product of the probability and weighted average of the minimum, most likely, and maximum values.
(probability (%) * (minimum + 4*most likely + maximum)/6))
 Status:
 Active (Not Started) Risk is being actively monitored and controlled, but the response plan has not been initiated.
 Active (Ongoing) Risk is being actively monitored and controlled, and the response plan is currently being implemented.
 Active (Complete) The risk is still being being actively monitored and controlled; however all work on the response plan is complete.
 Dormant (Not Started) Risk is not currently a high priority, but may become active in the future  This status is not often used.
 Retired (Complete) Risk is no longer a threat to project objectives  Risks that are no longer applicable should be listed as "retired" and not deleted from the register.
 Tracking Comments: Include any comments associated with the risk and the update to the risk in this box.  Utilize the comments section to provide updates on actions or owners, or to note changes associated with the response plans.
Prepared by: Shahrzad Khosravi- PMP, RMP		
Risk Register
   Step 1: Risk Identification         Step 2: Risk Assessment           Step 3: Risk Response     Step 4: Monitor & Control
           Rank   Cost Impact ($M)     Schedule Impact (Months)
  # Category Phase Opportunity / Threat Risk Risk Name Detailed Description Risk Effect P6 Work Package or Activity Related to Risk Probability (1 - 5) Consequence (1-5) Severity (Priority) Probability (%) Minimum (@10%) Most Likely Cost ($M) Maximum (@90%) COST IMPACT Minimum Most Likely (no. Of Months) Maximum TIME IMPACT (Months) Response Category Administration Notification Response Risk Owner Contingency Plan Status Date Last Updated Tracking Comments
  1           0       12           
Opportunity - Rating Desc.
  Impact Rating
 Context Project Impacts
  -1 -2 -3 -4 -5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH)
 Quality Negligible improvements to design quality
Negligible improvements to long-term maintenance 
Barely noticeable Noticeable improvements to design quality
Minor improvements to long-term maintenance
Minor scope improvements Significant improvements to design quality
Significant improvements to long-term maintenance
Significant scope improvements Major improvements to design quality
Major improvements to long-term maintenance
Major scope improvements Exceptional improvements to design quality
Exceptional improvements to long-term maintenance
Exceptional scope improvements
 Cost
(% of project cost) cost savings = 0.5% cost savings = 1% cost savings = 2% cost savings = 3% cost savings > 4%
 Schedule
(% of project schedule, subject to schedule analysis) schedule savings = 1% schedule savings = 2% schedule savings = 3% schedule savings = 4% schedule savings > 5%
 Context Agency Impacts
  -1 -2 -3 -4 -5
  Low Medium-Low Medium Medium-High High
 Safety Negligible safety improvements Minor safety improvements Significant safety improvements Major safety improvements Exceptional safety improvements
 Congestion Negligible congestion relief or additional capacity from anticipated scope within corridor  Noticeable congestion relief or additional capacity from anticipated scope within corridor Significant congestion relief or additional capacity from anticipated scope at several points within the corridor or major congestion relief at single point within the corridor  Major congestion relief or additional capacity from anticipated scope at several points along the corridor or exceptional congestion relief at single point within the corridor  Exceptional congestion relief or additional capacity from anticipated scope at several points within the corridor 
 Connectivity Negligible improvement from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting roadways Minor improvement from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting  roadways Significant improvement from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting roadways  Major improvement from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting  roadways Exceptional improvements from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting  roadways 
 Best-in-class agency Negligible benefit to agency's reputation Minor benefit to agency's reputation, single press release Significant benefit to agency's reputation, multiple press releases in regional news Major benefit to agency's reputation, major industry awards, multiple press releases, statewide news Exceptional industry recognition, multiple press releases, national news
  Probability Rating
  1 2 3 4 5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH)
 Probability of occurrence 1-15% 16-30% 31-65% 66-80% 81-99%
 Note: probability scale for threats and opportunities are color coded the same to ensure conditional formatting of cells is consistent and severity rankings are calculated correctly
  1 2 3 4 5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH) Total Needed to reach 100
 Scale modifier 15 15 35 15 20 100 0
Threat - Rating Desc.
  Impact Rating
 Context Project Impacts
  1 2 3 4 5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH)
 Quality Negligible impacts to design quality
Negligible impacts to long-term maintenance 
Barely noticeable Requires Design Variance
Minor impacts to long-term maintenance
Minor scope reduction Requires Design waiver
Significant impacts to long-term maintenance
Major scope reduction Does not meet acceptable standards and requires Design Exception
Major impacts to long-term maintenance
Changes unacceptable to TxDOT or stakeholders Does not meet acceptable standards and Design Exception not likely
Unacceptable impacts to long-term maintenance
Project does not meet need and purpose
 Cost
(% of project cost) cost increase = 0.5%  cost increase = 1% cost increase =2% cost increase = 3% cost increase > 4%
 Schedule
(% of project schedule, subject to schedule analysis) delay = 2% delay = 3% delay = 5% delay = 7% delay > 10%
 Context Agency Impacts
  1 2 3 4 5
  Low Medium-Low Medium Medium-High High
 Safety First Aid Restricted Duty / Doctor Visit Recordable Lost Time Major injury or death
 Congestion Minor additional congestion or reduction in capacity from anticipated scope Noticeable additional congestion or reduction in capacity from anticipated scope  Significant additional congestion or reduction in capacity from anticipated scope at several points or major congestion at single point within the corridor  Major additional congestion or reduction in capacity from anticipated scope at several points along the corridor or exceptional congestion at single point within the corridor  Unacceptable additional congestion or reduction in capacity from anticipated scope at any point within the corridor
 Connectivity Negligible decrease from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting roadways Minor decrease from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting  roadways Significant decrease from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting roadways  Major decrease from anticipated scope to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting  roadways Unacceptable decrease from anticipated scope  to project limits; or to throughput or connectivity at intersections, interchanges, or parallel or connecting roadways
 Best-in-class agency Negligible impact to agency's reputation Noticeable impact to agency's reputation, single press release Significant impact to agency's reputation, multiple press releases in regional news Major impact to agency's reputation, multiple press releases, statewide news Potential legal action, multiple press releases, national news
  Probability Rating
  1 2 3 4 5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH)
 Probability of occurrence 1-15% 16-30% 31-65% 66-80% 81-100%
 Note: probability scale for threats and opportunities are color coded the same to ensure conditional formatting of cells is consistent and severity rankings are calculated correctly
  1 2 3 4 5
  Insignificant (VL) Minor(L) Medium(M) Major(H) Sever(VH) Total Needed to reach 100
 Scale modifier 15 15 35 15 20 100 0
Severity matrix
   Low Med- Low Med Med- High High
 Probability 5 5 10 15 20 25
  4 4 8 12 16 20
  3 3 6 9 12 15
  2 2 4 6 8 10
  1 1 2 3 4 5
   1 2 3 4 5
   Consequence
 Probability 5 -5 -10 -15 -20 -25
  4 -4 -8 -12 -16 -20
  3 -3 -6 -9 -12 -15
  2 -2 -4 -6 -8 -10
  1 -1 -2 -3 -4 -5
   -1 -2 -3 -4 -5
   Consequence
Risk Allocation
Lists
 Categories                      Status
 PM Organizational Environmental Design ROW Railroad Utilities External Construction Maint_Ops            Identified – Risk documented, but analysis not performed
 Estimating Project Dependencies Requirements Structures Requirements Requirements Requirements Contractor Site/ Environmental Conditions Pavement            Analysis Complete – Risk analysis done, but response planning not performed
 Planning/ Scope Resources Documentation Drainage Coordination Coordination Coordination Subcontractors/ Suppliers Requirements Structures            Planning Complete – Response planning complete
 Controlling Funding/ Financing Coordination Traffic Control Design Design Design Political Stakeholders Materials ITS            Triggered – Risk trigger has occurred and threat has been realized
 Communications Prioritization  Geotechnical Funding / Cost   Public Stakeholders Traffic Control Tolling            Resolved – Realized risk has been contained
 Schedule Policy  Survey    Other Agencies Phasing Drainage            Retired – Identified risk no longer requires active monitoring (e.g. risk trigger has passed)
    Roadway    Legislative/ Legal Performance/ Reliability Routine Maintenance
    Grading    Market Conditions Complexity and Interface Other
    Aesthetics    Competition
    Signing/ Lighting/ Signals
    ITS
    Bike Pedestrian
    Tolling
 Column B Column E Column V  Column F  Column W Column D
 Risk Type Risk Type Response Category Urgency Risk/Issue Status  Planning/Scoping
 Project Opportunity Avoid High Risk Not Started Yes Design
 Program Threat Transfer Medium Issue Active (Ongoing) No Procurement
  Both Mitigate Low  Omitted (Deleted)  Construction
   Share   Retired (Complete)  Precomm./Comm.
   Accept   Happened (Issue)
   Enhance   Closed
   Exploit
  Category
  Owner/Client
  Sub-contractors
  Vendors
  Natural Env.
  Market/Economy
  Political
  PROJECT Team 
  Resource /Human Res.
  Funding & Budgeting 
  Culture
  Location
  Experience
  Requirement /scope 
  Tech. Availiable
  Complexity
  Quality
  Performance & Reability
  Tech. Limits
  Design 
  Change 
  Interfaces
  supply
  Construction  Exploit
  Plan / Estimate  Enhance
  Controls
  Communication
  HSE
  Contract
 Issue 4
 Risk 60
 Threat 51
 Opportunity 8
 Both 1
Sheet1
 
 <
Project Name
>
 
                                      <
Date
>
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
1. PROJECT INFORMATION 
 
 
Project Name 
 
Project Code 
 
 The Surrey College Library Renovation Project 
 
 Sur-Ren-Lib/02
 
Project Sponsor  
 
Project Manager 
 
 Surinder Kaur / Chief Librarian
 
 MGMT 640-Team Four
 
Client Sponsor 	 
 
Client PM 
 
BC Ministry of Education 
 
 Library Board 
 
Prepared By 
 
Prepared On 
 
 MGMT 640-Team Four
 
 Surrey College
 
Authorized By 
 
Authorized On 
 
 Dr. Sharzad Khosravi
 
 Surrey Library Renovation
 
2. PROJECT DESCRIPTION 
 Throughout the renovation of the first floor of the Surrey College Library, this project offers a unique and contemporary library design in the College Library, which is more enhanced energy-efficient and environment-friendly. It is also presumed to be extra supportive of research, artistic project, and society intercommunication.
3. PROJECT JUSTIFICATION/BUSINESS NEED 
 With a long history and impressive building, the library is a symbol structure of the college. Notwithstanding, it does not cope with the transformation of information retrieval practices in the current generation. It does not present a welcoming and user-friendly setting anymore because of its incapability of providing adequate computing workstation and multimedia devices and additional socializing features demanded by students and faculty. A philanthropic financial grant of a quarter a million CAD was given to the university library from the Ministry of Education, and the library board decided to use the donation on renovating the 1st floor of the College Library.
4. PROJECT OBJECTIVES 
 This project aims to develop a library design in the Surrey College Library to please library users’ knowledge retrieval routine in the modernized age. Its overall purpose is to improve productivity and enhance the study method for students and faculty in the current information era.
5. PROJECT SUCCESS CRITERIA 
 
·  Meet users’ demands of computers and networks
·  Encourage group inquiry and collaborative activity
·  Plan suits the information retrieving practices of library users in the modernized time
·  Boost study and research
·  Building is energy-efficient and user-friendly
· Extra natural light is let inside the library. 
· Users notice the increased area laptop friendly.
· Users detect the study places extremely useful and competent for group talks.
· Computing workstations are massively utilized by library users, and users determine the computers to run really effectively.
· Users notice the fresh location of reference and reserve spaces quite useful and proper for retrieval and discussion  
6. HIGH LEVEL SCOPE
Project Exclusions/Out of Scope 
·  Relocation, circulation, and reference services related to the collections that are stored originally on the first floor
· The warming, cooling, also air conditioning systems of the library construction will not be replaced in the plan as mentioned above.
7. HIGH LEVEL BUDGET 
 
 
Estimated Budget (CAD)
 
Employee Cost
 
100.000
 
Equipment Cost
 
150.000
 
Total
 
250.000
8. HIGH LEVEL SCHEDULE 
 
 
Start Date 
 
Finish Date 
 
 September 1st  ,2021
 
 March 15th ,2022
 
Phases 
 
Phases 
 
Name 
 
Description 
 
Start Date 
 
Finish Date 
 
Phase A 
 
 Floor plan design 
 
Questionnaire of users’ opinions and designing
 
 September 1st
 
 September 29th
 
Phase B 
 
 Construction 
 
 Window replacement
Wall and floor restoration
Electronic line setup
Study place and furnishing
 
 September 30th
 
 January 30th
 
Phase C 
 
 Computer setup
 
 setting up computers
 
January 4th
 
 February 5th
 
Phase D 
 
 Final
 
 review , report
 
 February 6th
 
 March 15th
 
High Level Milestone 
Phase 1: 
 
Phases 
 
Start Date 
 
Finish Date 
 
Major Deliverables 
 
Phase A 
 
 September 1st
 
 September 14th
 
 Poll (opinions of stakeholders)
 
Phase B 
 
 September 15th
 
 September 30th
 
 Desing according to expectations
 
Phase C 
 
 September 30th
 
 November 20th
 
 Window, Wall and floor restoration
 
Phase 2: 
 
Phases  
 
Start Date 
 
Finish Date 
 
Major Deliverables 
 
Phase A 
 
 November 21st
 
 January 30th
 
Electronic line setup, Study place furnishing
 
Phase B 
 
 January 4th
 
 February 5th
 
Computer setup
 
Phase C 
 
 February 6th
 
 March 15th
 
 Review, Report
 
9. HIGH LEVEL COST ESTIMATES 
 
Employee and Equipment cost for this project are estimated as 250.000 CAD.
 
 
10. 
 
PROJECT INFLUENCES 
 
Assumptions 
 The following assumptions were made in planning the Project :
· The Ministry and College Board of Governors has recognized the restoration project's goal, and supports will be provided by the ministry, university, and library management.
· - Staff are ready to complete design, tasks, and purposes
· Failure to identify changes to draft deliverables within the time specified in the project timeline will result in project delays
· The project plan may evolve as new information and issues are revealed
 
Constraints 
 Possible project constraints are following:
· The donation might not be enough for the whole project, and financial support has to be solicited from the Ministry or university board
· Due to the characteristics of the restoration, the production phases of six months might not be sufficient
· Any staff are from other college services, so other tasks might use large parts of their time and make them unavailable to accomplish their responsibilities promptly for this Project.
 
Risks 
· Cost calculation maybe not fit with the budget
· Expected times for phases may not be sufficient
· Staff may not have enough time for their duties
· Problems may arise between employees.
· Scope of work may be exceeded during the project process 
 
 <
Project Name
>
 
                                      <
Date
>
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Issues 	 
1) Project manager will document the issue as soon as a change which impacts any phase of the project, including agenda, staffing, and spending;
2) Project manager will evaluate the issue, ascertain the associated influence to the project, and will transmit the case, forward with a suggestion to the steering committee for analysis and resolution;
3) Project Steering body will review the issue and agree on whether to confirm, refuse, or revise based on the available report and the project manager’s guidance. If no agreement is reached, the issue will be progressing to the project sponsor for a final decision;
4) Project sponsor will execute a final decision on the permission or rejection of a development; 
5) the Project manager will inform the primary requestor of the judgment.
 
 
11. 
 
PROJECT ORGANIZATION 
 
 
Organization Chart 
 
 
 
 
 
 
 
 
Key Stakeholders 
 
 
 
· Ministry Representative
· College board of Governors 
· Surrey College Library Advisory Committee 
· Library Restoration Project Steering Committee 
· Representatives from Student Union  
· City representative
 Other Key Stakeholders
· Students and employees of Surrey College library 
· College faculty
 
 
 
Project Manager Role 
 
 
 
· Lead the project taking into account integration across all areas
· Lead and direct various project resources
· Monitor and administratethe project scehdule, budget and risk
· Organize steering comittee meetings and present status report 
· Lead team member and motivatethem
· Inform project statust to stakeholders, staff, other parts
· Maintain project documentation
· Taking legal responsibility such as signin documents
 
 
 
Project Sponsor Role 
 
 
 Project sponsor will render a final decision on the approval or denial of a change. 
Client PM Role 
 A client project manager performs as a mediator between the client and the project team. Therefore, ensure that the client's needs are met while also ensuring that the project progresses in the right direction.
Client Sponsor Role 
 The project client sponsor assesses the project's actual progress against what was planned and provides feedback to the project manager as required. Plus, help the project manager and teamwork more autonomously resolve matters as they emerge while ensuring processes are being ensued.
 
 
12. 
 
REQUIREMENTS  
 While this project initially began as restoration project, the restoration solution required such extensive work on the building that it provided an opportunity to achieve much more.
Resources 
There are three main sources in total in the project.
· Equipment resources
· Personnel resources
· Financial resources
Material  
· Various construction materials
· Electronic tools
Equipments  
· Construction materials
· Computers and other devices
· Furnitures
· Office supplies
Signature : 	 	 	 	 	 	 	Date: 08/06/2021
 
 
Title  : Project Manager
WBS
 
OBS
Project Steering Comittee
Design Team
Construction Team
Project Manager
Budget Manager
Technical Team
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
 
 <
Project Name
>
 
                                      <
Date
>
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
1. PROJECT INFORMATION 
 
 
Project Name 
 
Project Code 
 
 The Surrey College Library Renovation Project 
 
 Sur-Ren-Lib/02
 
Project Sponsor  
 
Project Manager 
 
 Surinder Kaur / Chief Librarian
 
 MGMT 640-Team Four
 
Client Sponsor 	 
 
Client PM 
 
BC Ministry of Education 
 
 Library Board 
 
Prepared By 
 
Prepared On 
 
 MGMT 640-Team Four
 
 Surrey College
 
Authorized By 
 
Authorized On 
 
 Dr. Sharzad Khosravi
 
 Surrey Library Renovation
 
2. PROJECT DESCRIPTION 
 Throughout the renovation of the first floor of the Surrey College Library, this project offers a unique and contemporary library design in the College Library, which is more enhanced energy-efficient and environment-friendly. It is also presumed to be extra supportive of research, artistic project, and society intercommunication.
3. PROJECT JUSTIFICATION/BUSINESS NEED 
 With a long history and impressive building, the library is a symbol structure of the college. Notwithstanding, it does not cope with the transformation of information retrieval practices in the current generation. It does not present a welcoming and user-friendly setting anymore because of its incapability of providing adequate computing workstation and multimedia devices and additional socializing features demanded by students and faculty. A philanthropic financial grant of a quarter a million CAD was given to the university library from the Ministry of Education, and the library board decided to use the donation on renovating the 1st floor of the College Library.
4. PROJECT OBJECTIVES 
 This project aims to develop a library design in the Surrey College Library to please library users’ knowledge retrieval routine in the modernized age. Its overall purpose is to improve productivity and enhance the study method for students and faculty in the current information era.
5. PROJECT SUCCESS CRITERIA 
 
·  Meet users’ demands of computers and networks
·  Encourage group inquiry and collaborative activity
·  Plan suits the information retrieving practices of library users in the modernized time
·  Boost study and research
·  Building is energy-efficient and user-friendly
· Extra natural light is let inside the library. 
· Users notice the increased area laptop friendly.
· Users detect the study places extremely useful and competent for group talks.
· Computing workstations are massively utilized by library users, and users determine the computers to run really effectively.
· Users notice the fresh location of reference and reserve spaces quite useful and proper for retrieval and discussion  
6. HIGH LEVEL SCOPE
Project Exclusions/Out of Scope 
·  Relocation, circulation, and reference services related to the collections that are stored originally on the first floor
· The warming, cooling, also air conditioning systems of the library construction will not be replaced in the plan as mentioned above.
7. HIGH LEVEL BUDGET 
 
 
Estimated Budget (CAD)
 
Employee Cost
 
100.000
 
Equipment Cost
 
150.000
 
Total
 
250.000
8. HIGH LEVEL SCHEDULE 
 
 
Start Date 
 
Finish Date 
 
 September 1st  ,2021
 
 March 15th ,2022
 
Phases 
 
Phases 
 
Name 
 
Description 
 
Start Date 
 
Finish Date 
 
Phase A 
 
 Floor plan design 
 
Questionnaire of users’ opinions and designing
 
 September 1st
 
 September 29th
 
Phase B 
 
 Construction 
 
 Window replacement
Wall and floor restoration
Electronic line setup
Study place and furnishing
 
 September 30th
 
 January 30th
 
Phase C 
 
 Computer setup
 
 setting up computers
 
January 4th
 
 February 5th
 
Phase D 
 
 Final
 
 review , report
 
 February 6th
 
 March 15th
 
High Level Milestone 
Phase 1: 
 
Phases 
 
Start Date 
 
Finish Date 
 
Major Deliverables 
 
Phase A 
 
 September 1st
 
 September 14th
 
 Poll (opinions of stakeholders)
 
Phase B 
 
 September 15th
 
 September 30th
 
 Desing according to expectations
 
Phase C 
 
 September 30th
 
 November 20th
 
 Window, Wall and floor restoration
 
Phase 2: 
 
Phases  
 
Start Date 
 
Finish Date 
 
Major Deliverables 
 
Phase A 
 
 November 21st
 
 January 30th
 
Electronic line setup, Study place furnishing
 
Phase B 
 
 January 4th
 
 February 5th
 
Computer setup
 
Phase C 
 
 February 6th
 
 March 15th
 
 Review, Report
 
9. HIGH LEVEL COST ESTIMATES 
 
Employee and Equipment cost for this project are estimated as 250.000 CAD.
 
 
10. 
 
PROJECT INFLUENCES 
 
Assumptions 
 The following assumptions were made in planning the Project :
· The Ministry and College Board of Governors has recognized the restoration project's goal, and supports will be provided by the ministry, university, and library management.
· - Staff are ready to complete design, tasks, and purposes
· Failure to identify changes to draft deliverables within the time specified in the project timeline will result in project delays
· The project plan may evolve as new information and issues are revealed
 
Constraints 
 Possible project constraints are following:
· The donation might not be enough for the whole project, and financial support has to be solicited from the Ministry or university board
· Due to the characteristics of the restoration, the production phases of six months might not be sufficient
· Any staff are from other college services, so other tasks might use large parts of their time and make them unavailable to accomplish their responsibilities promptly for this Project.
 
Risks 
· Cost calculation maybe not fit with the budget
· Expected times for phases may not be sufficient
· Staff may not have enough time for their duties
· Problems may arise between employees.
· Scope of work may be exceeded during the project process 
 
 <
Project Name
>
 
                                      <
Date
>
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
 
 <
Surrey College Library RefsdşflmdsşafnaşsRenovatipon     
>
 
 
8/6/21
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Issues 	 
1) Project manager will document the issue as soon as a change which impacts any phase of the project, including agenda, staffing, and spending;
2) Project manager will evaluate the issue, ascertain the associated influence to the project, and will transmit the case, forward with a suggestion to the steering committee for analysis and resolution;
3) Project Steering body will review the issue and agree on whether to confirm, refuse, or revise based on the available report and the project manager’s guidance. If no agreement is reached, the issue will be progressing to the project sponsor for a final decision;
4) Project sponsor will execute a final decision on the permission or rejection of a development; 
5) the Project manager will inform the primary requestor of the judgment.
 
 
11. 
 
PROJECT ORGANIZATION 
 
 
Organization Chart 
 
 
 
 
 
 
 
 
Key Stakeholders 
 
 
 
· Ministry Representative
· College board of Governors 
· Surrey College Library Advisory Committee 
· Library Restoration Project Steering Committee 
· Representatives from Student Union  
· City representative
 Other Key Stakeholders
· Students and employees of Surrey College library 
· College faculty
 
 
 
Project Manager Role 
 
 
 
· Lead the project taking into account integration across all areas
· Lead and direct various project resources
· Monitor and administratethe project scehdule, budget and risk
· Organize steering comittee meetings and present status report 
· Lead team member and motivatethem
· Inform project statust to stakeholders, staff, other parts
· Maintain project documentation
· Taking legal responsibility such as signin documents
 
 
 
Project Sponsor Role 
 
 
 Project sponsor will render a final decision on the approval or denial of a change. 
Client PM Role 
 A client project manager performs as a mediator between the client and the project team. Therefore, ensure that the client's needs are met while also ensuring that the project progresses in the right direction.
Client Sponsor Role 
 The project client sponsor assesses the project's actual progress against what was planned and provides feedback to the project manager as required. Plus, help the project manager and teamwork more autonomously resolve matters as they emerge while ensuring processes are being ensued.
 
 
12. 
 
REQUIREMENTS  
 While this project initially began as restoration project, the restoration solution required such extensive work on the building that it provided an opportunity to achieve much more.
Resources 
There are three main sources in total in the project.
· Equipment resources
· Personnel resources
· Financial resources
Material  
· Various construction materials
· Electronic tools
Equipments  
· Construction materials
· Computers and other devices
· Furnitures
· Office supplies
Signature : 	 	 	 	 	 	 	Date: 08/06/2021
 
 
Title  : Project Manager
WBS
 
OBS
Project Steering Comittee
Design Team
Construction Team
Project Manager
Budget Manager
Technical Team
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
Project Charter 	<Company Name> 	Page 1 
[PBP-PC-T-1.0a] 	Confidential 
Copyright 2018 www.pmbypm.com 
You are free to use it for your projects or for educational purposes, share or transmit to others; provided no part of this template is modified and no money is exchanged. 
 
				    	
					CATEGORIES
        	Economics 
        	Nursing 
        	Applied Sciences 
        	Psychology 
        	Science 
        	Management 
        	Computer Science 
        	Human Resource Management 
        	Accounting 
        	Information Systems 
        	English 
        	Anatomy 
        	Operations Management 
        	Sociology 
        	Literature 
        	Education 
        	Business & Finance 
        	Marketing 
        	Engineering 
        	Statistics  
        	Biology 
        	Political Science 
        	Reading 
        	History 
        	Financial markets 
        	Philosophy 
        	Mathematics 
        	Law 
        	Criminal 
        	Architecture and Design 
        	Government 
        	Social Science 
        	World history 
        	Chemistry 
        	Humanities
        	Business Finance
        	Writing
        	Programming
        	Telecommunications Engineering 
        	Geography 
        	Physics 
        	Spanish 
        	ach
e. Embedded Entrepreneurship
f. Three Social Entrepreneurship Models
g. Social-Founder Identity
h. Micros-enterprise Development
Outcomes
Subset 2. Indigenous Entrepreneurship Approaches (Outside of Canada)
a. Indigenous Australian Entrepreneurs Exami
        	Calculus 
        	(people influence of 
others) processes that you perceived occurs in this specific Institution Select one of the forms of stratification highlighted (focus on inter the intersectionalities 
of these three) to reflect and analyze the potential ways these (
        	American history 
        	Pharmacology 
        	Ancient history 
        	. Also
        	Numerical analysis 
        	Environmental science 
        	Electrical Engineering 
        	Precalculus 
        	Physiology 
        	Civil Engineering 
        	Electronic Engineering 
        	ness Horizons
        	Algebra 
        	Geology 
        	Physical chemistry 
        	nt
When considering both O
        	lassrooms
        	Civil 
        	Probability 
        	ions
Identify a specific consumer product that you or your family have used for quite some time. This might be a branded smartphone (if you have used several versions over the years)
        	or the court to consider in its deliberations. Locard’s exchange principle argues that during the commission of a crime
        	Chemical Engineering 
        	Ecology 
        	aragraphs (meaning 25 sentences or more). Your assignment may be more than 5 paragraphs but not less.
INSTRUCTIONS: 
To access the FNU Online Library for journals and articles you can go the FNU library link here: 
https://www.fnu.edu/library/
In order to
        	n that draws upon the theoretical reading to explain and contextualize the design choices. Be sure to directly quote or paraphrase the reading
        	ce to the vaccine. Your campaign must educate and inform the audience on the benefits but also create for safe and open dialogue. A key metric of your campaign will be the direct increase in numbers. 
Key outcomes: The approach that you take must be clear
        	Mechanical Engineering 
        	Organic chemistry 
        	Geometry 
        	nment 
Topic 
You will need to pick one topic for your project (5 pts) 
Literature search 
You will need to perform a literature search for your topic
        	Geophysics 
        	you been involved with a company doing a redesign of business processes
        	Communication on Customer Relations. Discuss how two-way communication on social media channels impacts businesses both positively and negatively. Provide any personal examples from your experience
        	od pressure and hypertension via a community-wide intervention that targets the problem across the lifespan (i.e. includes all ages).
Develop a community-wide intervention to reduce elevated blood pressure and hypertension in the State of Alabama that in
        	in body of the report
Conclusions
References (8 References Minimum)
*** Words count = 2000 words.
*** In-Text Citations and References using Harvard style.
*** In Task section I’ve chose (Economic issues in overseas contracting)"
        	Electromagnetism 
        	w or quality improvement; it was just all part of good nursing care.  The goal for quality improvement is to monitor patient outcomes using statistics for comparison to standards of care for different diseases
        	e a 1 to 2 slide Microsoft PowerPoint presentation on the different models of case management.  Include speaker notes... .....Describe three different models of case management.
        	visual representations of information. They can include numbers
        	SSAY
        	ame workbook for all 3 milestones. You do not need to download a new copy for Milestones 2 or 3. When you submit Milestone 3
        	pages):
Provide a description of an existing intervention in Canada
        	making the appropriate buying decisions in an ethical and professional manner.
Topic: Purchasing and Technology
You read about blockchain ledger technology. Now do some additional research out on the Internet and share your URL with the rest of the class 
        	be aware of which features their competitors are opting to include so the product development teams can design similar or enhanced features to attract more of the market. The more unique
        	low (The Top Health Industry Trends to Watch in 2015) to assist you with this discussion. 
  
    https://youtu.be/fRym_jyuBc0
Next year the $2.8 trillion U.S. healthcare industry will   finally begin to look and feel more like the rest of the business wo
        	evidence-based primary care curriculum. Throughout your nurse practitioner program
        	Vignette
Understanding Gender Fluidity
Providing Inclusive Quality Care
Affirming Clinical Encounters
Conclusion
References
Nurse Practitioner Knowledge
        	Mechanics 
        	and word limit is unit as a guide only.
The assessment may be re-attempted on two further occasions (maximum three attempts in total). All assessments must be resubmitted 3 days within receiving your unsatisfactory grade. You must clearly indicate “Re-su
        	Trigonometry 
        	Article writing
        	Other
        	5. June 29
        	After the components sending to the manufacturing house
        	1. In 1972 the Furman v. Georgia case resulted in a decision that would put action into motion. Furman was originally sentenced to death because of a murder he committed in Georgia but the court debated whether or not this was a violation of his 8th amend
        	One of the first conflicts that would need to be investigated would be whether the human service professional followed the responsibility to client ethical standard.  While developing a relationship with client it is important to clarify that if danger or
        	Ethical behavior is a critical topic in the workplace because the impact of it can make or break a business
        	No matter which type of health care organization
        	With a direct sale
        	During the pandemic
        	Computers are being used to monitor the spread of outbreaks in different areas of the world and with this record
        	3. Furman v. Georgia is a U.S Supreme Court case that resolves around the Eighth Amendments ban on cruel and unsual punishment in death penalty cases. The Furman v. Georgia case was based on Furman being convicted of murder in Georgia. Furman was caught i
        	One major ethical conflict that may arise in my investigation is the Responsibility to Client in both Standard 3 and Standard 4 of the Ethical Standards for Human Service Professionals (2015).  Making sure we do not disclose information without consent ev
        	4. Identify two examples of real world problems that you have observed in your personal
        	Summary & Evaluation: Reference & 188. Academic Search Ultimate
        	Ethics
        	We can mention at least one example of how the violation of ethical standards can be prevented. Many organizations promote ethical self-regulation by creating moral codes to help direct their business activities
        	*DDB is used for the first three years
        	For example
        	The inbound logistics for William Instrument refer to purchase components from various electronic firms. During the purchase process William need to consider the quality and price of the components. In this case
        	4. A U.S. Supreme Court case known as Furman v. Georgia (1972) is a landmark case that involved Eighth Amendment’s ban of unusual and cruel punishment in death penalty cases (Furman v. Georgia (1972)
        	With covid coming into place
        	In my opinion
        	with
        	Not necessarily all home buyers are the same! When you choose to work with we buy ugly houses Baltimore & nationwide USA
        	The ability to view ourselves from an unbiased perspective allows us to critically assess our personal strengths and weaknesses. This is an important step in the process of finding the right resources for our personal learning style. Ego and pride can be 
        	· By Day 1 of this week
        	While you must form your answers to the questions below from our assigned reading material
        	CliftonLarsonAllen LLP (2013)
        	5 The family dynamic is awkward at first since the most outgoing and straight forward person in the family in Linda
        	Urien
        	The most important benefit of my statistical analysis would be the accuracy with which I interpret the data. The greatest obstacle
        	From a similar but larger point of view
        	4 In order to get the entire family to come back for another session I would suggest coming in on a day the restaurant is not open
        	When seeking to identify a patient’s health condition
        	After viewing the you tube videos on prayer
        	Your paper must be at least two pages in length (not counting the title and reference pages)
        	The word assimilate is negative to me. I believe everyone should learn about a country that they are going to live in. It doesnt mean that they have to believe that everything in America is better than where they came from. It means that they care enough 
        	Data collection
        	Single Subject Chris is a social worker in a geriatric case management program located in a midsize Northeastern town. She has an MSW and is part of a team of case managers that likes to continuously improve on its practice. The team is currently using an
        	I would start off with Linda on repeating her options for the child and going over what she is feeling with each option.  I would want to find out what she is afraid of.  I would avoid asking her any “why” questions because I want her to be in the here an
        	Summarize the advantages and disadvantages of using an Internet site as means of collecting data for psychological research (Comp 2.1) 25.0\% Summarization of the advantages and disadvantages of using an Internet site as means of collecting data for psych
        	Identify the type of research used in a chosen study
        	Compose a 1
        	Optics
        	effect relationship becomes more difficult—as the researcher cannot enact total control of another person even in an experimental environment. Social workers serve clients in highly complex real-world environments. Clients often implement recommended inte
        	I think knowing more about you will allow you to be able to choose the right resources
        	Be 4 pages in length
        	soft MB-920 dumps review and documentation and high-quality listing pdf MB-920 braindumps also recommended and approved by Microsoft experts. The practical test
        	g
        	One thing you will need to do in college is learn how to find and use references. References support your ideas. College-level work must be supported by research. You are expected to do that for this paper. You will research
        	Elaborate on any potential confounds or ethical concerns while participating in the psychological study 20.0\% Elaboration on any potential confounds or ethical concerns while participating in the psychological study is missing. Elaboration on any potenti
        	3 The first thing I would do in the family’s first session is develop a genogram of the family to get an idea of all the individuals who play a major role in Linda’s life. After establishing where each member is in relation to the family
        	A Health in All Policies approach
        	Note: The requirements outlined below correspond to the grading criteria in the scoring guide. At a minimum
        	Chen
        	Read Connecting Communities and Complexity: A Case Study in Creating the Conditions for Transformational Change
        	Read Reflections on Cultural Humility
        	Read A Basic Guide to ABCD Community Organizing
        	Use the bolded black section and sub-section titles below to organize your paper.  For each section
        	Losinski forwarded the article on a priority basis to Mary Scott
        	Losinksi wanted details on use of the ED at CGH. He asked the administrative resident