POWERPOINT 10 PAGES AND CALCULATIONS ON WORD/EXCEL - Management
MobileGo Project Recovery
The project management office or project office (PMO) is concerned that the MobileGo project is behind schedule and in danger of being late. Assume that a project meeting has been scheduled so that you and your project team can propose a course of action to reduce the project schedule. The PMO has provided your team with project simulation data spreadsheet . To prepare for this PMO meeting, carry out the following:
Analyze the data provided in the spreadsheet, and calculate at least two options for crashing the schedule.
Identify likely risks associated with your revised schedule as well as your strategy for their mitigation.
Evaluate concerns associated with the motivation of the team given the increase in project complexity, the additional overtime, and the high-pressure environment that the team is likely to face.
Explain the steps you will take as project manager to hold the team together and keep it functioning despite the difficulty.
Complete the crash calculations and options in a Word or Excel document, and submit it for grading. Additionally, you will create a PowerPoint presentation of at least 10 slides that explains your crash plan as well as your overall plan to successfully lead the team to the finish line. Use at least one outside source to support your recommendations for improvement. All sources used, including the textbook, must be referenced; paraphrased and quoted material must have accompanying citations following proper APA Style. You must either use speaker notes or audio to fully explain your slides. Be sure to elaborate in your speaker notes or audio; do not simply repeat the text from your slides.
Course Project Scenario
The Course Project Scenario
In this course, you are introduced to a complex project scenario as follows:
You have been assigned to be the project manager for the facility, equipment, and business system upgrade of a call center. This requires:
*moving all existing call center stations to a newer, larger facility;
*installing and testing a high speed, high capacity Wi-Fi network in the new facility;
*upgrading workstations so that they include wireless capability;
*installing a new call center management software; and
*converting a legacy proprietary business system with a CRM application to a new business system.
In this project scenario, time is of the essence. The project sponsor requires that the project take no longer than 6 months to complete. Further, the budget is constrained so that the number of people assigned to the project is very limited and includes the following:
Outside consultants: 2
Project Manager: 1
Business system project lead: 1
Business system implementation team: 3
Wireless system project lead: 1
Wireless system implementation team: 3
Relocation project lead: 1
Relocation team: 2
Workstation project lead: 1
Workstation upgrade team: 2
Outside contractors: Up to five multidisciplinary contractors are allowed in the budget.
Note: The wireless system project lead and the workstation project lead are the same person. Two of the three-member wireless system implementation team overlap with the workstation team. This means that only four resources are available for the wireless system implementation and workstation upgrade (not counting the possible use of contractors). The total resources available to the project include 14 people plus 5 contractors.
In this assignment, you will use this scenario to identify the project requirements, define the project scope using a work breakdown structure (WBS), and define the activities required to produce project deliverables.
Background
MobileGo is a small company that sells prepaid mobile phones in selected markets. Its primary sales and service channel is carried out over the internet and by phone. Sales and service has been supported with a team of 36 customer service representatives in a small building. Customers, accounts, and all business functions have traditionally been managed by a proprietary software application using in-house servers that was contracted out early in the founding of the company. All workstations currently connect to the internet and the internal servers supporting the legacy business system and office applications. This is a problem because the company had to move workstations to different parts of the building as the company has grown (thereby making network wiring out of control). The company has grown 150\% over the last 5 years and as a result, the systems, the building, and the overall infrastructure have become outgrown. The company has therefore recognized the need to move to a new location and upgrade workstations and systems. The immediate need is to expand from 36 stations to 50—with the plan to triple that number within the next 3 years. The immediate challenges are little funding and people to spare for this set of initiatives. With multiple activities occurring at once and severe constraints on schedule and resources, it is acknowledged that this is a highly complex project.
The Assignment
You have been assigned as the overall project manager for this important initiative. Your supporting team consists of 14 members (not counting contractors), including two outside consultants supporting the business system and wireless upgrade. Now that you have been given this important assignment, here are your next steps:
1. Identify what you deem to be the client requirements.
2. Using the requirements list, create a work breakdown structure (WBS) that identifies all project deliverables.
3. Identify the activities (tasks) required to produce each project deliverable.
4. When identifying project activities, highlight each that may be expected to require the same resources to be carried out in parallel. These highlights will be your first clue that the management of the project can be expected to require some complex maneuvering.
Guidance notes: The client requirements should be three pages in length to summarize. You must use at least one outside source that is peer-reviewed or academic in nature from the CSU Online Library. Draw upon the high-level project scenario and, in addition, feel free to draw upon your own experience or research when developing the requirements. Also, remember that the WBS includes deliverables only rather than activities. While the WBS may be written in either a graphical or indented outline form, the indented outline may be a better approach. This is because the activities, once identified, may be easily layered over the project deliverables when using the outline form.
Submit the requirements summary in a Word document. The WBS and Activity Identification exercise may be completed using either Word or Excel.
Unit VI Earned Value
Activity Start Planned Duration Actual Duration Plan Date Actual Date Difference Budget Actual Difference Resource Label Resources Number Hourly $ Total $ Duration (days) Grand Total
Call Center Stations OC1 Outside consultant 1 1 $ 150.00 $ 150.00
Call center stations inventory 3/1/20 14 14 3/15/20 3/15/20 0 $2,100.00 $2,100.00 $0.00 OC1 OC2 Outside consultant 2 1 $ 150.00 $ 150.00
Call center layout-new 3/15/20 15 18 3/30/20 4/2/20 -3 $ 4,500.00 $ 5,400.00 -$900.00 C1,C2,C3 PM Project Manager: 1 $ 100.00 $ 100.00
Call center stations breakdown 4/2/20 8 13 4/10/20 4/15/20 -5 $ 2,400.00 $ 3,900.00 -$1,500.00 C1,C2,C3 BSPL Business system project lead: 1 $ 125.00 $ 125.00
Call center stations pack 4/10/20 5 20 4/15/20 4/30/20 -15 $ 1,500.00 $ 6,000.00 -$4,500.00 C1,C2,C3 BSIT Business system implementation team: 3 $ 350.00 $ 1,050.00
Call center stations move 4/30/20 10 10 4/20/20 5/10/20 -20 $ 2,000.00 $ 2,000.00 $0.00 C1,C2,C3 WSPL Wireless system project lead: 1 $ 100.00 $ 100.00
Call center stations install 5/10/20 9 15 5/1/20 5/25/20 -24 $1,800.00 $3,000.00 -$1,200.00 C4,C5 WSIT Wireless system implementation team: 3 $ 85.00 $ 255.00
Office Furniture & Equipment Move RPL Relocation project lead: 1 $ 90.00 $ 90.00
Inventory furniture 3/15/20 15 15 3/30/20 3/30/20 0 $1,350.00 $1,350.00 $0.00 RPL RT Relocation team: 2 $ 250.00 $ 500.00
Inventory equipment 3/30/20 11 11 4/10/20 4/10/20 0 $6,435.00 $6,435.00 $0.00 WPL,WUT WPL Workstation project lead: 1 $ 85.00 $ 85.00
Create office layout 4/10/20 5 5 4/15/20 4/15/20 0 $2,925.00 $2,925.00 $0.00 WPL,WUT WUT Workstation upgrade team: 2 $ 250.00 $ 500.00
Dissassemble 4/15/20 5 7 4/20/20 4/22/20 -2 $2,925.00 $4,095.00 -$1,170.00 WPL,WUT C1 Contractor 1 1 $ 100.00 $ 100.00
Pack 4/22/20 9 9 5/1/20 5/1/20 0 $5,400.00 $5,400.00 $0.00 WUT, C1 C2 Contractor 2 1 $ 100.00 $ 100.00
Move 5/1/20 14 16 5/15/20 5/17/20 -2 $8,400.00 $9,600.00 -$1,200.00 WUT, C1 C3 Contractor 3 1 $ 100.00 $ 100.00
Install 5/17/20 3 8 5/20/20 5/25/20 -5 $1,800.00 $4,800.00 -$3,000.00 WUT, C1 C4 Contractor 4 1 $ 100.00 $ 100.00
Wi-Fi C5 Contractor 5 1 $ 100.00 $ 100.00
New site survey 3/10/20 5 5 3/15/20 3/15/20 0 $1,250.00 $1,250.00 $0.00 WSPL,OC2
Develop requirements 3/15/20 15 15 3/30/20 3/30/20 0 $5,325.00 $5,325.00 $0.00 WSPL,WSIT
Vendor search 3/20/20 21 21 4/10/20 4/10/20 0 $2,100.00 $2,100.00 $0.00 WSPL
Vendor selection 4/20/20 10 13 4/30/20 5/3/20 -3 $2,550.00 $3,315.00 -$765.00 WSIT
Design layout 4/15/20 5 15 4/20/20 4/30/20 -10 $450.00 $1,350.00 -$900.00 WSPL
Order Wi-Fi equipment 4/30/20 1 5 5/1/20 5/5/20 -4 $250.00 $1,250.00 -$1,000.00 WSPL
Install Wi-Fi system 5/5/20 10 13 5/15/20 5/18/20 -3 $850.00 $1,105.00 -$255.00 WSIT
Test Wi-Fi system 5/18/20 7 5/25/20 5/25/20 0 $3,500.00 WSIT
Station Upgrade
Wireless card selection 3/30/20 21 21 4/20/20 4/20/20 0 $12,600.00 $12,600.00 $0.00 WUT,C1
Order wireless cards 4/20/20 11 11 5/1/20 5/1/20 0 $5,500.00 $5,500.00 $0.00 WUT
Install PC wireless cards 5/1/20 14 18 5/15/20 5/19/20 -4 $11,200.00 $14,400.00 -$3,200.00 WUT,C1,C2,C3
Load software 5/19/20 6 5/25/20 5/25/20 0 $1,200.00 C4,C5
Test wireless PC 5/25/20 5 5/30/20 6/2/20 -3 $3,000.00 WUT,C1
Call Center Software
Install software 5/25/20 10 5/15/20 5/30/20 -15 $5,850.00 WPL,WUT
Test software 5/3/20 27 5/30/20 6/5/20 -6 $15,795.00 WPL,WUT
Software training 6/5/20 4 6/1/20 6/10/20 -9 $2,340.00 WPL,WUT
Trial run 6/10/20 5 6/15/20 6/17/20 -2 $750.00 OC1
Cutover to new software 6/17/20 13 6/30/20 6/30/20 0 $1,950.00 OC1
Business System Software
Install software 5/25/20 5 5/30/20 6/2/20 -3 $5,875.00 $5,875.00 BSPL, BSIT
Test software 6/13/20 2 6/15/20 6/15/20 0 $2,350.00 $2,350.00 BSPL, BSIT
Software training 6/17/20 3 6/20/20 6/23/20 -3 $3,975.00 $3,975.00 BSPL, BSIT,OC1
Trial run 6/24/20 6 6/30/20 6/30/20 0 $7,050.00 $7,050.00 BSPL, BSIT
Cutover to new software 7/12/20 3 7/15/20 7/18/20 -3 $3,525.00 $3,525.00 BSPL, BSIT
UNIT VIII_Recovery
Task Duration Number Activity Predecessor Best-Case Likely Worst-Case Duration Variance Alpha Beta Random Path Length
Start 0 0 0 0 0 0 Start-1-2-3-7-4-9-12-13-14 81.22
23.4793412721 1 Wireless card selection Start 18 21 28 21.67 2.78 2.70 4.66 22.9979362537 Start-1-2-3-7-5-12-13-14 75.06
13.3167599616 2 Order wireless cards 1 6 11 18 11.33 4.00 3.51 4.38 11.599389534 Start-1-8-13-14 54.52
13.5289703298 3 Install PC wireless cards 2 10 14 21 14.50 3.36 3.15 4.55 17.6327635662 Start-1-2-3-7-6-12,13,14 56.83
6.0605395877 4 Load software 7 4 6 15 7.17 3.36 1.84 4.54 7.3587036708 Start-1-2-3-7-10-13-14 74.81
6.128248494 5 Test Wireless PC 7 4 5 10 5.67 1.00 1.73 4.49 5.6099388732 Start-1-2-3-7-11-13-14 83.68
6 Call Center Software 7
13.3196957612 7 Install software 3 4 10 15 9.83 3.36 4.22 3.74 9.9230280541 Critical Path # 6
23.4881418869 8 Test software 1 21 27 35 27.33 5.44 3.58 4.34 24.2266192446 Critical Path Start-1-2-3-7-11-13-14
3.241011386 9 Software training 4 3 4 7 4.33 0.44 2.33 4.67 4.4173947048
6.8833109791 10 Trial run 7,12 4 5 11 5.83 1.36 1.56 4.40 5.3608572429 Trial Duration Critical Path
12.8856509987 11 Cutover to new software 7 8 13 17 12.83 2.25 4.27 3.68 14.235793416 5.33 6
12 Business System Software 7 1 20.3963836741 4
5.0714306705 13 Install software 12, 8 3 5 9 5.33 1.00 2.94 4.62 4.5628671982 2 21.3373924926 4
1.6156660907 14 Test software 13 1 2 5 2.33 0.44 2.33 4.67 2.7314646869 3 17.3076145502 1
9.8439664968 15 Software training 13 2 3 10 8.67 1.78 3.33 0.67 9.6436868856 4 23.7122478765 4
4.851824067 16 Trial run 13 4 10 18 5.67 5.44 0.33 2.45 4.1694283889 5 19.4734548334 1
2.0000000256 17 Cutover to new software 13 2 3 12 2.33 2.78 0.01 0.15 2 6 20.2547083104 2
7 25.6512534416 1
8 24.6239616244 1
9 21.778658588 1
Task Duration ES EF LS LF TS Critical Best Likely Worst Budget Crash Days Cost per day improve Max
1 Station Upgrade
2 Wireless card selection 21.67 0.00 21.67 0.00 21.67 0.00 TRUE 18 21 28 $12,600.00 5 $500.00 $2,500.00
3 Order wireless cards 11.33 21.67 33.00 21.67 33.00 0.00 TRUE 6 11 18 $5,500.00 4 $850.00 $3,400.00
4 Install PC wireless cards 14.50 0.00 14.50 0.00 14.50 0.00 TRUE 10 14 21 $11,200.00 4 $1,225.00 $4,900.00
5 Load software 7.17 0.00 7.17 -20.00 -12.83 -20.00 FALSE 4 6 15 $1,200.00 1 $600.00 $600.00
6 Test Wireless PC 5.67 0.00 5.67 -18.50 -12.83 -18.50 FALSE 4 5 10 $3,000.00 2 $425.00 $850.00
7 Call Center Software
8 Install software 9.83 0.00 9.83 -9.83 0.00 -9.83 FALSE 4 10 15 $5,850.00 3 $750.00 $2,250.00
9 Test software 27.33 14.50 41.83 14.50 41.83 0.00 TRUE 21 27 35 $15,795.00 6 $525.00 $3,150.00
10 Software training 4.33 0.00 4.33 -4.33 0.00 -4.33 FALSE 3 4 7 $2,340.00 1 $600.00 $600.00
11 Trial run 5.83 0.00 5.83 -5.83 0.00 -5.83 FALSE 4 5 11 $750.00 1 $750.00 $750.00
12 Cutover to new software 12.83 41.83 54.67 -12.83 0.00 -54.67 FALSE 8 13 17 $1,950.00 2 $335.00 $670.00
13 Business System Software
14 Install software 5.33 0.00 5.33 0.00 5.33 0.00 TRUE 3 5 9 $5,875.00 1 $500.00 $500.00
15 Test software 2.33 5.33 7.67 5.33 7.67 0.00 TRUE 1 2 5 $2,350.00 0 $850.00 $0.00
16 Software training 8.67 7.67 16.33 7.67 16.33 0.00 TRUE 2 3 10 $3,975.00 2 $1,225.00 $2,450.00
17 Trial run 5.67 16.33 22.00 16.33 22.00 0.00 TRUE 4 10 18 $7,050.00 1 $600.00 $600.00
18 Cutover to new software 2.33 2 3 7 1.50 0.69 2 3 12 $3,525.00 0 $425.00
CATEGORIES
Economics
Nursing
Applied Sciences
Psychology
Science
Management
Computer Science
Human Resource Management
Accounting
Information Systems
English
Anatomy
Operations Management
Sociology
Literature
Education
Business & Finance
Marketing
Engineering
Statistics
Biology
Political Science
Reading
History
Financial markets
Philosophy
Mathematics
Law
Criminal
Architecture and Design
Government
Social Science
World history
Chemistry
Humanities
Business Finance
Writing
Programming
Telecommunications Engineering
Geography
Physics
Spanish
ach
e. Embedded Entrepreneurship
f. Three Social Entrepreneurship Models
g. Social-Founder Identity
h. Micros-enterprise Development
Outcomes
Subset 2. Indigenous Entrepreneurship Approaches (Outside of Canada)
a. Indigenous Australian Entrepreneurs Exami
Calculus
(people influence of
others) processes that you perceived occurs in this specific Institution Select one of the forms of stratification highlighted (focus on inter the intersectionalities
of these three) to reflect and analyze the potential ways these (
American history
Pharmacology
Ancient history
. Also
Numerical analysis
Environmental science
Electrical Engineering
Precalculus
Physiology
Civil Engineering
Electronic Engineering
ness Horizons
Algebra
Geology
Physical chemistry
nt
When considering both O
lassrooms
Civil
Probability
ions
Identify a specific consumer product that you or your family have used for quite some time. This might be a branded smartphone (if you have used several versions over the years)
or the court to consider in its deliberations. Locard’s exchange principle argues that during the commission of a crime
Chemical Engineering
Ecology
aragraphs (meaning 25 sentences or more). Your assignment may be more than 5 paragraphs but not less.
INSTRUCTIONS:
To access the FNU Online Library for journals and articles you can go the FNU library link here:
https://www.fnu.edu/library/
In order to
n that draws upon the theoretical reading to explain and contextualize the design choices. Be sure to directly quote or paraphrase the reading
ce to the vaccine. Your campaign must educate and inform the audience on the benefits but also create for safe and open dialogue. A key metric of your campaign will be the direct increase in numbers.
Key outcomes: The approach that you take must be clear
Mechanical Engineering
Organic chemistry
Geometry
nment
Topic
You will need to pick one topic for your project (5 pts)
Literature search
You will need to perform a literature search for your topic
Geophysics
you been involved with a company doing a redesign of business processes
Communication on Customer Relations. Discuss how two-way communication on social media channels impacts businesses both positively and negatively. Provide any personal examples from your experience
od pressure and hypertension via a community-wide intervention that targets the problem across the lifespan (i.e. includes all ages).
Develop a community-wide intervention to reduce elevated blood pressure and hypertension in the State of Alabama that in
in body of the report
Conclusions
References (8 References Minimum)
*** Words count = 2000 words.
*** In-Text Citations and References using Harvard style.
*** In Task section I’ve chose (Economic issues in overseas contracting)"
Electromagnetism
w or quality improvement; it was just all part of good nursing care. The goal for quality improvement is to monitor patient outcomes using statistics for comparison to standards of care for different diseases
e a 1 to 2 slide Microsoft PowerPoint presentation on the different models of case management. Include speaker notes... .....Describe three different models of case management.
visual representations of information. They can include numbers
SSAY
ame workbook for all 3 milestones. You do not need to download a new copy for Milestones 2 or 3. When you submit Milestone 3
pages):
Provide a description of an existing intervention in Canada
making the appropriate buying decisions in an ethical and professional manner.
Topic: Purchasing and Technology
You read about blockchain ledger technology. Now do some additional research out on the Internet and share your URL with the rest of the class
be aware of which features their competitors are opting to include so the product development teams can design similar or enhanced features to attract more of the market. The more unique
low (The Top Health Industry Trends to Watch in 2015) to assist you with this discussion.
https://youtu.be/fRym_jyuBc0
Next year the $2.8 trillion U.S. healthcare industry will finally begin to look and feel more like the rest of the business wo
evidence-based primary care curriculum. Throughout your nurse practitioner program
Vignette
Understanding Gender Fluidity
Providing Inclusive Quality Care
Affirming Clinical Encounters
Conclusion
References
Nurse Practitioner Knowledge
Mechanics
and word limit is unit as a guide only.
The assessment may be re-attempted on two further occasions (maximum three attempts in total). All assessments must be resubmitted 3 days within receiving your unsatisfactory grade. You must clearly indicate “Re-su
Trigonometry
Article writing
Other
5. June 29
After the components sending to the manufacturing house
1. In 1972 the Furman v. Georgia case resulted in a decision that would put action into motion. Furman was originally sentenced to death because of a murder he committed in Georgia but the court debated whether or not this was a violation of his 8th amend
One of the first conflicts that would need to be investigated would be whether the human service professional followed the responsibility to client ethical standard. While developing a relationship with client it is important to clarify that if danger or
Ethical behavior is a critical topic in the workplace because the impact of it can make or break a business
No matter which type of health care organization
With a direct sale
During the pandemic
Computers are being used to monitor the spread of outbreaks in different areas of the world and with this record
3. Furman v. Georgia is a U.S Supreme Court case that resolves around the Eighth Amendments ban on cruel and unsual punishment in death penalty cases. The Furman v. Georgia case was based on Furman being convicted of murder in Georgia. Furman was caught i
One major ethical conflict that may arise in my investigation is the Responsibility to Client in both Standard 3 and Standard 4 of the Ethical Standards for Human Service Professionals (2015). Making sure we do not disclose information without consent ev
4. Identify two examples of real world problems that you have observed in your personal
Summary & Evaluation: Reference & 188. Academic Search Ultimate
Ethics
We can mention at least one example of how the violation of ethical standards can be prevented. Many organizations promote ethical self-regulation by creating moral codes to help direct their business activities
*DDB is used for the first three years
For example
The inbound logistics for William Instrument refer to purchase components from various electronic firms. During the purchase process William need to consider the quality and price of the components. In this case
4. A U.S. Supreme Court case known as Furman v. Georgia (1972) is a landmark case that involved Eighth Amendment’s ban of unusual and cruel punishment in death penalty cases (Furman v. Georgia (1972)
With covid coming into place
In my opinion
with
Not necessarily all home buyers are the same! When you choose to work with we buy ugly houses Baltimore & nationwide USA
The ability to view ourselves from an unbiased perspective allows us to critically assess our personal strengths and weaknesses. This is an important step in the process of finding the right resources for our personal learning style. Ego and pride can be
· By Day 1 of this week
While you must form your answers to the questions below from our assigned reading material
CliftonLarsonAllen LLP (2013)
5 The family dynamic is awkward at first since the most outgoing and straight forward person in the family in Linda
Urien
The most important benefit of my statistical analysis would be the accuracy with which I interpret the data. The greatest obstacle
From a similar but larger point of view
4 In order to get the entire family to come back for another session I would suggest coming in on a day the restaurant is not open
When seeking to identify a patient’s health condition
After viewing the you tube videos on prayer
Your paper must be at least two pages in length (not counting the title and reference pages)
The word assimilate is negative to me. I believe everyone should learn about a country that they are going to live in. It doesnt mean that they have to believe that everything in America is better than where they came from. It means that they care enough
Data collection
Single Subject Chris is a social worker in a geriatric case management program located in a midsize Northeastern town. She has an MSW and is part of a team of case managers that likes to continuously improve on its practice. The team is currently using an
I would start off with Linda on repeating her options for the child and going over what she is feeling with each option. I would want to find out what she is afraid of. I would avoid asking her any “why” questions because I want her to be in the here an
Summarize the advantages and disadvantages of using an Internet site as means of collecting data for psychological research (Comp 2.1) 25.0\% Summarization of the advantages and disadvantages of using an Internet site as means of collecting data for psych
Identify the type of research used in a chosen study
Compose a 1
Optics
effect relationship becomes more difficult—as the researcher cannot enact total control of another person even in an experimental environment. Social workers serve clients in highly complex real-world environments. Clients often implement recommended inte
I think knowing more about you will allow you to be able to choose the right resources
Be 4 pages in length
soft MB-920 dumps review and documentation and high-quality listing pdf MB-920 braindumps also recommended and approved by Microsoft experts. The practical test
g
One thing you will need to do in college is learn how to find and use references. References support your ideas. College-level work must be supported by research. You are expected to do that for this paper. You will research
Elaborate on any potential confounds or ethical concerns while participating in the psychological study 20.0\% Elaboration on any potential confounds or ethical concerns while participating in the psychological study is missing. Elaboration on any potenti
3 The first thing I would do in the family’s first session is develop a genogram of the family to get an idea of all the individuals who play a major role in Linda’s life. After establishing where each member is in relation to the family
A Health in All Policies approach
Note: The requirements outlined below correspond to the grading criteria in the scoring guide. At a minimum
Chen
Read Connecting Communities and Complexity: A Case Study in Creating the Conditions for Transformational Change
Read Reflections on Cultural Humility
Read A Basic Guide to ABCD Community Organizing
Use the bolded black section and sub-section titles below to organize your paper. For each section
Losinski forwarded the article on a priority basis to Mary Scott
Losinksi wanted details on use of the ED at CGH. He asked the administrative resident