Integrating ERM with Strategy Do, H., Railwaywalla, M., & Thayer, J. (2016). Integration of ERM with Strategy reading provided 3 use cases on methods of integrating ERM with strategy. Review the approach of each company and provide a summary of the key differences between the three implementations.
integration_of_erm_and_strategy_case_study.pdf
Unformatted Attachment Preview
Integration of ERM
with Strategy
Case Study Analysis – April 2016
Prepared by: Ha Do, Maria Railwaywalla, Jeremiah Thayer
Graduate Students, Poole College of Management, NCSU
Table of Contents
I.
Introduction ......................................................................................................... 2
II.
Case Study: Mitchell Industries .......................................................................... 3
III.
Case Study: Eli Lilly ............................................................................................ 9
IV.
Case Study: Daisy Company .............................................................................. 15
V.
Conclusion........................................................................................................... 21
VI.
Appendix ............................................................................................................. 22
A1: Mitchell Industries: Risk Assessment Template
A2: Mitchell Industries: Template Assessing Risk in Relation to Strategy
A3: Eli Lilly: Risk Assessment Template
A4: Eli Lilly: Risk Ranking Matrix
A5: Daisy Company: Risk Template
A6: Daisy Company: Rating Scale
VII. About the Authors .............................................................................................. 34
Introduction
One of the greatest sources of risk for today’s companies arises from the context of its strategic
plan. While a company’s strategy drives its value creation, it also entails risk-taking; when
strategies change or new initiatives are implemented, new risks may be introduced or existing
risks could change. The greater the degree of integration between strategy and risk management,
the more likely it is that a company will be able to successfully implement its strategy.
Enterprise Risk Management (ERM) is an emerging process that can serve many purposes: as a
tool for risk management, strategic planning, and identification of emerging opportunities and
potential competitive advantages. The purpose of this case study is to provide a description of the
processes used by three different companies in different industries to illustrate the ways these
companies have integrated ERM in the context of their strategy.
These case studies are based on real life examples of how companies have attempted to better
integrate their ERM process within their strategic planning process. The three cases reveal the
variety of methods that can be used based on a company’s strategic objectives, business model,
culture, and maturity in ERM implementation. This report also highlights key takeaways as
points of comparison when assessing the level of integration between ERM and the strategic
planning and implementation process.
Readers should keep the following in mind:
● ERM personnel can use this document to assess their company’s level of integration and
discuss how their current ERM process can be improved and be more closely aligned with
the strategic planning process.
● The methods of integrating ERM with strategy will vary based on the company. Just as ERM
requires customization to suit a company’s unique objectives, culture, and business model,
the integration of risk management and strategic planning also requires a company to
consider its objectives and culture before deciding the best way to align the two processes.
Increasing complexity due to industry changes, globalization, and shifts in technology and
business cycles can produce more risks related to strategy than ever before. By establishing a
close link between a company’s strategic planning and risk management processes, management
can help ensure that new strategic initiatives are connected to appropriate risk mitigation
strategies, that changes in the company’s strategic direction are accompanied by timely
assessment of new or emerging risks, and that the company is better prepared to identify riskrelated competitive advantages.
INTEGRATION OF ERM WITH STRATEGY -
2
Case Study: Mitchell Industries
Background of the Organization
Mitchell Industries is a global aerospace, defense and information technology company. They
provide a broad range of management, engineering, technical, scientific, logistics and
information services. The company was founded in 1985 and has grown organically and through
a number of acquisitions. Headquartered in Chicago, Illinois and incorporated in Delaware, the
company conducts most of its business with the U.S. Government, principally the Department of
Defense (DoD) and intelligence community. The company has 120 locations worldwide,
including 72 international offices, approximately 24,000 employees and customers in 150
countries.
Overview of ERM
Mitchell Industries views risk management as critical to its success. Risk management is
embedded in many business processes such as executive planning, program / contract
management, research and development, etc. However, following the financial crisis, there was
an increased focus on risk oversight practices. Credit rating agencies, such as Standard and
Poor’s, began assessing enterprise risk management processes as part of their corporate credit
ratings analysis, and there were signs that new requirements would be placed on Boards of
Directors regarding their risk oversight responsibilities. During this same time frame, the
company appointed a new board member to chair the Audit Committee who placed an increased
focus on the company’s risk management practices. Leadership of the organization also began to
see the need for a more formal enterprise wide process for managing risk. All of these events led
to the implementation of a formal structured ERM process in 2009.
Initially, Mitchell Industries maintained independent ERM and strategy processes that occurred
in parallel. As leaders recognized the value of being better informed of and prepared for risk
events, steps were taken to align and integrate ERM with the strategic planning process. There
are now several points of integration between the two processes to ensure they are in sync and
reflect the priorities of the organization as a whole.
Integration of ERM with Strategy
The next few paragraphs highlight the details of the ERM cycle, strategy planning process and
their integration.
ERM Cycle
The company has an annual ERM cycle which is facilitated by the ERM team. The ERM team
consists of three members, the Director and two analysts. They are the link between the members
of the organization responsible for risk management and the enterprise risk management process.
The annual process begins with the identification and assessment of risks in the January /
February time frame. The ERM team administers a survey to Vice Presidents (VPs) and selected
INTEGRATION OF ERM WITH STRATEGY -
3
Directors (direct reports to VPs). At the same time, interviews are conducted with the CEO and
the CEO’s direct reports (senior executives).
The ERM team analyzes the information gathered in the surveys and interviews to prioritize the
risks. The prioritized risks are typically presented using a heat map. For each of the
organization’s top risks (typically 8-10 risks), an owner is identified. The risk owners, also
referred to as risk champions, are responsible for assigning a risk manager, approving mitigation
(action) plans, resourcing the plan, and briefing the plan to the Board. The risk owners are
assisted by risk managers who are responsible for the risk action plan. The ERM team works
with the risk managers to understand survey findings and develop mitigation plans. The risk
managers are responsible for managing the risk and tracking the progress of the mitigation plan.
They own the risk and report progress of the mitigation plans to the ERM team on a quarterly
basis. The ERM team summarizes the risks, the risk mitigation plan and the progress in
implementing the plans on a dashboard that is reported to executive leadership and the Board.
During the third quarter, the ERM team updates the earlier identified risks by conducting a
second round of interviews with the CEO and senior executives. They factor in risks that arise
due to external factors such as regulatory risks, geo-political risks, economic risks, technological
risks, etc. Any significant changes are incorporated into the heat map and used to refine the risk
mitigation plans.
The company has several business units and the ERM team shares business unit specific risks
(heat maps) with the executive leadership team of each business unit during the March timeframe.
During the second quarter, the business units consider these risks, determine the risks critical to
their respective business unit and communicate their action/ mitigation plans back to the
executive team during the July time frame as part of their strategic plan.
Strategic Planning Process
Mitchell Industries has an annual strategic planning cycle. The process starts in December and is
both a top-down and bottom-up approach. The CEO owns the overall strategy. That strategy is
primarily developed by the Corporate Strategy office, working in conjunction with business unit
strategists. Once the overall strategy is developed, the plan is communicated by the CEO to the
VPs at the annual Senior Leadership Meeting in the January/February timeframe and to the
Board in February.
The business units develop their respective strategies in light of their portfolio of products and
within the framework of the corporate strategy and guidance provided by the Corporate Strategy
office. This process begins in February and culminates in July with the Strategic Planning
Conference where the business unit leaders present their strategy for the upcoming year to the
CEO. Each business unit is also responsible for annually developing a three-year business plan
that reflects the implementation of the strategy. This plan is updated concurrently with the
strategy and is finalized in November.
INTEGRATION OF ERM WITH STRATEGY -
4
Mitchell Industries ERM & Strategy Implementation Timeline
Jan.
Strategy
ERM
Feb.
Mar.
CEO communicates strategy
to VPs &
Corporate Strategy provides
planning guidance to
Business Units
Apr.
May
Jun.
Jul.
Business Units develop strategic plans and factor in risks
communicated by ERM team in formulation of plans
ERM team conducts
ERM team
ERM team
enterprise-wide survey analyzes
communicates
of VPs and interviews
survey
survey results
executive leadership results and
Communication
to CEO and
team (CEO, Business unit prioritizes
of enterprise risks
Business Unit
leaders)
risks
to the Board
leaders
Aug.
Sep.
Business Units
communicate
strategic plans to
CEO
Oct.
Nov.
Dec.
Corporate
strategy
kick-off
Business Units develop and
present 3 year business plan
Interview results fed in
to Dec corporate
strategy kickoff
ERM team conducts
follow-up interviews
with executive team
Communication of risk
status to executive
leadership and the board
Continuous review of progress of mitigation plans
Integrating the Two Processes
The strategic planning process and ERM process are initiated in two different organizations and
start at slightly different times. Strategic planning starts with the CEO and strategy leads. ERM
starts with surveying the VPs and their direct reports. The two processes operate in parallel, with
both following an annual cycle and combined top-down / bottoms-up approach. There are several
points where information is shared between the two. This is how the company integrates the two
processes to ensure ERM and strategy are in sync and have an enterprise wide impact. The
following are the specific points of integration:
● Macro Level – The first point of integration is the third quarter risk update. This updated
information, which includes external risk developments that may impact the organization, is
communicated to the corporate strategy team who then factors the information into the
corporate-level strategy.
● Micro Level – The second stage of integration is at the business unit level. Each business
unit receives the broad strategic objectives post the CEO and VPs meeting (January/
February time frame). The business units also receive specific information about their top
risks from the ERM team (March time frame). The business units factor this information into
the formulation of their strategic plans.
● Third Level – The final stage of integration occurs when Functions develop strategies/
action plans to support Business Unit plans and address specific risks.
INTEGRATION OF ERM WITH STRATEGY -
5
Mitchell Industries ERM & Strategy Integration
Strategy Planning Process
ERM Process
Corporate strategy office
develops corporate strategy
plan on behalf of CEO
ERM team surveys the VPs and
directors to identify broad
level risks
ERM team interviews the CEO &
senior executives for additional risk
identification and assessment
Quarterly
reporting
Macro level integration
ERM team communicates the results of
the interviews/ surveys to the corporate
strategy team who incorporates the
same in strategic planning
ERM team:
Gathers information about external risks to the
organization
Consolidates the survey/ interview results
Communicates top risks to risk owners and
business units through heat maps
Works with risk managers to develop risk
mitigation plans
Conducts second round of interviews and
communicates to senior executive team
Risk owners identify a risk
manager, approve
mitigation plans and
provide resources for plans
Planning
guidance to BUs
Micro level integration
BU’s develop individual strategic
plans within the corporate guidance
framework and include BU specific
risks
BU leaders are
responsible for preparing
mitigation plans for their
respective BUs
Risk managers
develop and execute risk
mitigation plans and report
progress quarterly
CEO communicates strategy to
all VPs at Senior Leadership
Meeting
Functional units develop
strategies/ action plans to
support BU plans and
address specific risks
Business Units:
Receive broad strategic objectives
post CEO/ VP meeting
Receive guidance from Corporate
strategy office
Communicate respective strategic
plan to CEO
Develop 3 year business plans
Third level integration
Functional unit support to
BUs
Issues in Integration
The initial integration of the two processes was not simple and smooth. The company
encountered some challenges, but ultimately was able to adapt the process. The key issues faced
by the company and the steps that were taken to remedy those issues are as follows:
● Non-value Add Perception
The strategy and business unit leaders believed they had a complete understanding of the
internal and external environment. Therefore, they did not see the value offered by the ERM
team and the need for a separate risk identification and assessment process.
To deal with this, the ERM team worked to eliminate duplication and redundancy and show
the business unit leaders the value added by taking a comprehensive, enterprise wide
approach to risk. For example, the ERM team accumulated risk information from across the
enterprise and provided executive leaders with an enterprise view of risks that they otherwise
INTEGRATION OF ERM WITH STRATEGY -
6
would not get. In addition, they provided business unit leaders with an opportunity to shape
the process for gathering risk information so that the process would be more meaningful for
the business units. Over time, this helped the strategic and business unit leaders be more
accepting of the ERM process and team.
● Leadership Change
Another challenge faced by the organization was the frequent turnover in the top corporate
strategist position. This led to frequent adjustments in the planning process for the
organization. For example, at one time, there was heavy reliance on external sources for risk
information, however, with a change in personnel, the strategic planning function began
relying more on the internal ERM team for risk information. With that shift, the ERM team
was able to be more involved in the strategic planning process.
Through these changes, the ERM team recognized the need to
educate and advocate the value the ERM process can bring. They
now provide a basic introduction and overview of ERM to new
leaders. The education process is not always formal; ERM
professionals also look for opportunities to network within the
organization to make more people aware of the work the ERM
team performs and the resources they have to offer.
Future Steps
Like the ERM process overall, the integration of ERM and strategy is an ongoing effort which
continues to make incremental improvements each year. The company believes the integration is
working well especially since the current leadership is open to further opportunities to fine tune
the integration between the two.
Even with the advances the company has made in their ERM process, the company feels that
parts of the organization are still operating in silos and that improvements could be made in the
linkage of risk mitigation processes across organizational boundaries. The company does not
have a system to align strategic initiatives and risks at the business unit level with initiatives and
risks at the corporate level. This could potentially result in disconnects between the two. The
company is now piloting a new software tool that has the potential to link corporate level and
business unit level strategies and risks.
Another area of improvement recognized by the company is the resource allocation process as it
relates to risk mitigation. While risks are being considered in the strategic planning process, the
need for resources to mitigate high priority risks is not being considered alongside the resources
needed to implement strategic initiatives in each function area. Each functional team has their
initiatives that support the corporate strategy, but those initiatives are not explicitly linked to the
potential risks of achieving the corporate strategy. The ERM team is working with strategy and
functional teams to create better alignment of objectives, strategies and risks.
INTEGRATION OF ERM WITH STRATEGY -
7
The company has crossed the initial hurdle of identifying
and spreading awareness about the need for and benefits of
integrating ERM and strategy. In other words, they have
successfully answered the question “why is integration
necessary”. However, they are now in the stage of
answering the question “how to effectively implement the
integration” and “how to overcome the challenges of
integration”. Successfully dealing with these questions will
enable Mitchell Industries to move onto the advanced stage
of integration where corporate level and business unit level
strategies and risks are developed and managed in an
integrated, enterprise-wide process.
INTEGRATION OF ERM WITH STRATEGY -
8
Case Study: Eli Lilly
Background of the Organization
Headquartered in Indianapolis Indiana, Eli Lilly and Company focuses on the research,
development, manufacturing, sale and distribution of human pharmaceutical and animal health
products. The company sells products in approximately 120 countries worldwide. Eli Lilly has a
market capitalization of approximately $90 billion, revenue in 2014 of $20 billion, and
approximately 41,300 employees worldwide.
Overview of ERM
While the company’s ERM program began formally in 2005, the integration of ERM with the
company’s strategic planning process started in 2007. In order to promote the importance of a
strong connection and assess ways to improve the link between ERM and the company’s
strategic planning process, the Sr. Director of ERM initiated a series of sessions amongst leaders
from the Corporate Strategy, Ethics and Compliance (E&C), and Legal functions. It was
especially important that key strategic risks be included in the ERM process, and that leaders
within Eli Lilly’s strategic functions be able to provide inp ...
Purchase answer to see full
attachment
CATEGORIES
Economics
Nursing
Applied Sciences
Psychology
Science
Management
Computer Science
Human Resource Management
Accounting
Information Systems
English
Anatomy
Operations Management
Sociology
Literature
Education
Business & Finance
Marketing
Engineering
Statistics
Biology
Political Science
Reading
History
Financial markets
Philosophy
Mathematics
Law
Criminal
Architecture and Design
Government
Social Science
World history
Chemistry
Humanities
Business Finance
Writing
Programming
Telecommunications Engineering
Geography
Physics
Spanish
ach
e. Embedded Entrepreneurship
f. Three Social Entrepreneurship Models
g. Social-Founder Identity
h. Micros-enterprise Development
Outcomes
Subset 2. Indigenous Entrepreneurship Approaches (Outside of Canada)
a. Indigenous Australian Entrepreneurs Exami
Calculus
(people influence of
others) processes that you perceived occurs in this specific Institution Select one of the forms of stratification highlighted (focus on inter the intersectionalities
of these three) to reflect and analyze the potential ways these (
American history
Pharmacology
Ancient history
. Also
Numerical analysis
Environmental science
Electrical Engineering
Precalculus
Physiology
Civil Engineering
Electronic Engineering
ness Horizons
Algebra
Geology
Physical chemistry
nt
When considering both O
lassrooms
Civil
Probability
ions
Identify a specific consumer product that you or your family have used for quite some time. This might be a branded smartphone (if you have used several versions over the years)
or the court to consider in its deliberations. Locard’s exchange principle argues that during the commission of a crime
Chemical Engineering
Ecology
aragraphs (meaning 25 sentences or more). Your assignment may be more than 5 paragraphs but not less.
INSTRUCTIONS:
To access the FNU Online Library for journals and articles you can go the FNU library link here:
https://www.fnu.edu/library/
In order to
n that draws upon the theoretical reading to explain and contextualize the design choices. Be sure to directly quote or paraphrase the reading
ce to the vaccine. Your campaign must educate and inform the audience on the benefits but also create for safe and open dialogue. A key metric of your campaign will be the direct increase in numbers.
Key outcomes: The approach that you take must be clear
Mechanical Engineering
Organic chemistry
Geometry
nment
Topic
You will need to pick one topic for your project (5 pts)
Literature search
You will need to perform a literature search for your topic
Geophysics
you been involved with a company doing a redesign of business processes
Communication on Customer Relations. Discuss how two-way communication on social media channels impacts businesses both positively and negatively. Provide any personal examples from your experience
od pressure and hypertension via a community-wide intervention that targets the problem across the lifespan (i.e. includes all ages).
Develop a community-wide intervention to reduce elevated blood pressure and hypertension in the State of Alabama that in
in body of the report
Conclusions
References (8 References Minimum)
*** Words count = 2000 words.
*** In-Text Citations and References using Harvard style.
*** In Task section I’ve chose (Economic issues in overseas contracting)"
Electromagnetism
w or quality improvement; it was just all part of good nursing care. The goal for quality improvement is to monitor patient outcomes using statistics for comparison to standards of care for different diseases
e a 1 to 2 slide Microsoft PowerPoint presentation on the different models of case management. Include speaker notes... .....Describe three different models of case management.
visual representations of information. They can include numbers
SSAY
ame workbook for all 3 milestones. You do not need to download a new copy for Milestones 2 or 3. When you submit Milestone 3
pages):
Provide a description of an existing intervention in Canada
making the appropriate buying decisions in an ethical and professional manner.
Topic: Purchasing and Technology
You read about blockchain ledger technology. Now do some additional research out on the Internet and share your URL with the rest of the class
be aware of which features their competitors are opting to include so the product development teams can design similar or enhanced features to attract more of the market. The more unique
low (The Top Health Industry Trends to Watch in 2015) to assist you with this discussion.
https://youtu.be/fRym_jyuBc0
Next year the $2.8 trillion U.S. healthcare industry will finally begin to look and feel more like the rest of the business wo
evidence-based primary care curriculum. Throughout your nurse practitioner program
Vignette
Understanding Gender Fluidity
Providing Inclusive Quality Care
Affirming Clinical Encounters
Conclusion
References
Nurse Practitioner Knowledge
Mechanics
and word limit is unit as a guide only.
The assessment may be re-attempted on two further occasions (maximum three attempts in total). All assessments must be resubmitted 3 days within receiving your unsatisfactory grade. You must clearly indicate “Re-su
Trigonometry
Article writing
Other
5. June 29
After the components sending to the manufacturing house
1. In 1972 the Furman v. Georgia case resulted in a decision that would put action into motion. Furman was originally sentenced to death because of a murder he committed in Georgia but the court debated whether or not this was a violation of his 8th amend
One of the first conflicts that would need to be investigated would be whether the human service professional followed the responsibility to client ethical standard. While developing a relationship with client it is important to clarify that if danger or
Ethical behavior is a critical topic in the workplace because the impact of it can make or break a business
No matter which type of health care organization
With a direct sale
During the pandemic
Computers are being used to monitor the spread of outbreaks in different areas of the world and with this record
3. Furman v. Georgia is a U.S Supreme Court case that resolves around the Eighth Amendments ban on cruel and unsual punishment in death penalty cases. The Furman v. Georgia case was based on Furman being convicted of murder in Georgia. Furman was caught i
One major ethical conflict that may arise in my investigation is the Responsibility to Client in both Standard 3 and Standard 4 of the Ethical Standards for Human Service Professionals (2015). Making sure we do not disclose information without consent ev
4. Identify two examples of real world problems that you have observed in your personal
Summary & Evaluation: Reference & 188. Academic Search Ultimate
Ethics
We can mention at least one example of how the violation of ethical standards can be prevented. Many organizations promote ethical self-regulation by creating moral codes to help direct their business activities
*DDB is used for the first three years
For example
The inbound logistics for William Instrument refer to purchase components from various electronic firms. During the purchase process William need to consider the quality and price of the components. In this case
4. A U.S. Supreme Court case known as Furman v. Georgia (1972) is a landmark case that involved Eighth Amendment’s ban of unusual and cruel punishment in death penalty cases (Furman v. Georgia (1972)
With covid coming into place
In my opinion
with
Not necessarily all home buyers are the same! When you choose to work with we buy ugly houses Baltimore & nationwide USA
The ability to view ourselves from an unbiased perspective allows us to critically assess our personal strengths and weaknesses. This is an important step in the process of finding the right resources for our personal learning style. Ego and pride can be
· By Day 1 of this week
While you must form your answers to the questions below from our assigned reading material
CliftonLarsonAllen LLP (2013)
5 The family dynamic is awkward at first since the most outgoing and straight forward person in the family in Linda
Urien
The most important benefit of my statistical analysis would be the accuracy with which I interpret the data. The greatest obstacle
From a similar but larger point of view
4 In order to get the entire family to come back for another session I would suggest coming in on a day the restaurant is not open
When seeking to identify a patient’s health condition
After viewing the you tube videos on prayer
Your paper must be at least two pages in length (not counting the title and reference pages)
The word assimilate is negative to me. I believe everyone should learn about a country that they are going to live in. It doesnt mean that they have to believe that everything in America is better than where they came from. It means that they care enough
Data collection
Single Subject Chris is a social worker in a geriatric case management program located in a midsize Northeastern town. She has an MSW and is part of a team of case managers that likes to continuously improve on its practice. The team is currently using an
I would start off with Linda on repeating her options for the child and going over what she is feeling with each option. I would want to find out what she is afraid of. I would avoid asking her any “why” questions because I want her to be in the here an
Summarize the advantages and disadvantages of using an Internet site as means of collecting data for psychological research (Comp 2.1) 25.0\% Summarization of the advantages and disadvantages of using an Internet site as means of collecting data for psych
Identify the type of research used in a chosen study
Compose a 1
Optics
effect relationship becomes more difficult—as the researcher cannot enact total control of another person even in an experimental environment. Social workers serve clients in highly complex real-world environments. Clients often implement recommended inte
I think knowing more about you will allow you to be able to choose the right resources
Be 4 pages in length
soft MB-920 dumps review and documentation and high-quality listing pdf MB-920 braindumps also recommended and approved by Microsoft experts. The practical test
g
One thing you will need to do in college is learn how to find and use references. References support your ideas. College-level work must be supported by research. You are expected to do that for this paper. You will research
Elaborate on any potential confounds or ethical concerns while participating in the psychological study 20.0\% Elaboration on any potential confounds or ethical concerns while participating in the psychological study is missing. Elaboration on any potenti
3 The first thing I would do in the family’s first session is develop a genogram of the family to get an idea of all the individuals who play a major role in Linda’s life. After establishing where each member is in relation to the family
A Health in All Policies approach
Note: The requirements outlined below correspond to the grading criteria in the scoring guide. At a minimum
Chen
Read Connecting Communities and Complexity: A Case Study in Creating the Conditions for Transformational Change
Read Reflections on Cultural Humility
Read A Basic Guide to ABCD Community Organizing
Use the bolded black section and sub-section titles below to organize your paper. For each section
Losinski forwarded the article on a priority basis to Mary Scott
Losinksi wanted details on use of the ED at CGH. He asked the administrative resident