Develop a decision matrix, select a contract for your turnaround project, and provide a rationale and a statement of work (SOW) for the turnaround project. - Business Finance
At this point in the process, you need to help NearlyFree.com recognize different contract types and make the right selection for the turnaround project. As the consultant for Project Revive LLC, your final task will be to create the statement of work (SOW) that describes the expectations for the new employee orientation product the third-party vendor will provide. Note: the various resources needed for this assessment are linked below.Although you have a lot of experience preparing statements of work, NearlyFree.com has not completed this part of the procurement process before. So, as part of your services, you will guide NearlyFree.com through this process. Your task is to help your client recognize the benefits of a good SOW and the risks associated with a poor SOWPart 1: Project Contract AnalysisDeliverable: Develop a decision matrix, select a contract for your turnaround project, and provide a rationaleDevelop a decision matrix to determine the best type of contract for the project considering the circumstances, timing requirements, budget availability, market conditions, and availability.Select a contract for this project and explain your selection.Part 2: Statement of Work (SOW) AnalysisDeliverable: Create a statement of work (SOW) for the turnaround project.Prepare a contract statement of work (SOW) describing the product or service to be supplied by a third-party vendor.The statement of work is your opportunity to clearly communicate your requirements and expectations. Refer to similar products on the Internet for realistic information to use in your statement of work.You may wish to use this optional Statement of Work Template [DOC] to complete this task.You may use other formats, if the information thoroughly addresses the expectations and requirements of the product or service.The SOW should address the following aspects related to the product or service to be procured:Specifications.Approach.Scope.Roles and responsibilities.Product and deliverables schedule.Deliverables and costs.Change control.Acceptance management.Quantity.Quality standards.Performance data.Work location.Period of performance.Contract to be used.PreparationUse the software of your choice to develop the deliverables for this assessment.This assessment has two deliverables:Develop a decision matrix, select a contract for your turnaround project, and provide a rationale.Create a statement of work (SOW) for the turnaround project.Deliverable FormatReferences: There is no set number of references required for this assessment. Use scholarly or academic sources where applicable.Format:Microsoft Project is not required for this assessment. This assessment has two parts and two deliverables.Use your choice of MS Word, MS Visio, or MS PowerPoint to develop the comprehensive analysesThese analyses are professional documents and should therefore follow the corresponding Academic and Professional Document Guidelines [PDF], including single-spaced paragraphs.Use APA style and format for references and in-text citations.
cf_nearlyfree_governance__1_.docx
cf_project_charter.pdf
cf_quality.pdf
cf_scope.pdf
Unformatted Attachment Preview
NearlyFree.com IT Governance
The following is an excerpt from the NearlyFree.com IT Governance.
Below you will find the IT policies for the Service Oriented Architecture and Enterprise, which is
the basic framework and structure for all IT-related activities and customer and user interactions
at NearlyFree.com. The philosophy here is service centered on customer satisfaction and
quality.
IT Governance Overview
Governance policies provide guidelines to manage all IT programs and projects. Governance
establishes clear roles, responsibilities, and accountabilities for all project team members
including executive leadership and project managers. Industry best practices include the use of
a governance process to oversee and manage project spending and to ensure there is an
acceptable benefit or return on investment in all initiatives.
The key to the NearlyFree.com IT governance is the creation of the IT Program Management
Office (PMO). The PMO seeks to understand and integrate organizational business goals with
all approved project definitions and objectives. The PMO has a set definition and objectives,
which set the scope and boundaries to deliver project management methodologies, guidelines,
training, and investment benefits.
IT Service Oriented Governance Policies
The following types of policies apply to all service-oriented IT projects.
1. Project life cycle (design, development, and implementation) policies.
2. Quality management policies.
3. Configuration and change management policies.
All projects will have to adopt the project management office (PMO) quality management plan
and policies. Project change requests must go through the process and gain approval of the
change control board (CCB).
Amendment History – Document Status (Release #7, 2008)
Document
Version #
Approval
Date
Modified
By
Section, Page(s)and Text
Revised
7.0
2/1/08
HGM
Governance overview
7.1
2/7/08
HGM
PMO definition update
1
PMO Quality Management Discipline and Policies
Introduction
The project management office (PMO) upholds the IT service-oriented architecture and
enterprise, which is the basic framework and structure for all IT-related activities and projects.
The philosophy is service, centered on customer satisfaction and quality.
The PMO provides training and the quality management discipline to plan and control through
testing and continuous improvement to ensure that each project satisfies the needs for which it
was undertaken (PMBOK® measure of quality).
The scope of quality management includes the following:
• Quality planning.
• Quality control.
• Quality assurance.
These quality elements interact with each other and with each of the project management
disciplines.
Concept Map of PMO Quality Management Tools and Techniques (Project
Management Institute, 2004)
TOOLS and TECHNIQUES
*Benefit/Cost Analysis
*Benchmarking
*Flowcharting
*Design of Experiments
*Cost of Quality
INPUTS
OUTPUTS
*Quality Policy
*Quality Management
Plan
*Scope Statement
*Product Description
*Standards and
Regulations
*Other process
outputs
Quality
Planning
*Operational
Definitions
*Checklists
*Inputs to other
processes
2
Benefits
The project management office:
•
•
•
•
•
Identifies the requirements that will satisfy the needs of the project.
Identifies which quality standards are relevant to the project such as ISO 9001:2000 and
CMMI.
Measures and monitors specific project outputs to determine if they comply with relevant
project quality metrics and standards and comply within the variance thresholds.
Tests, evaluates, and validates all project outputs and overall project performance.
Documents quality management strategies and measurements that can be collected,
reviewed, and archived for reference in future projects.
Guidelines and Procedures
Step
Action
Responsible
personnel
1
Review project scope and deliverable specifications.
PM
2
Assemble organization quality policies, standards, and
regulations.
PM
3
Describe process using inputs and outputs in particular
team disciplines (tools and techniques).
PM and project team
4
Analyze outputs from steps 1, 2, and 3 and create a list
of operational definition of quality.
PM and project team
5
Compile items in a list and sort into logical groupings.
PM and project team
6
Create the checklist that various project team members
can use to inspect quality.
PM and project team
7
Develop a quality statement on how quality
management and quality plan will be implemented.
PM and project team
8
Develop a quality control procedure on how to examine
specific project results to see if they comply with the
quality standards and to identify means to eliminate any
error or unsatisfactory results.
Quality audit team
9
Establish quality assurance by evaluating project
performance on a regular basis to provide confidence
that the project will satisfy the quality standards
previously set.
Quality audit team
3
Quality Assurance Template
Quality Assurance Plan for [Project Name]
Prepared by:
Date:
1.0 Draft quality assurance plan.
1.1 Introduction.
1.2 Purpose.
1.3 Policy statement.
1.4 Scope.
2.0 Management.
2.1 Organizational structure.
2.2 Roles and responsibilities.
2.2.1 Technical monitor/senior management.
2.2.2 Task leader.
2.2.3 Quality assurance team.
2.2.3 Technical staff.
3.0 Required documentation.
4.0 Quality assurance procedures.
4.1 Walkthrough procedure.
4.2 Review process.
4.2.1 Review procedures.
4.3 Audit process.
4.3.1 Audit procedures.
4.4 Evaluation process.
4.5 Process improvement.
5.0 Problem reporting procedures.
5.1 Noncompliance reporting procedures.
6.0 Quality assurance metrics.
Appendix.
Quality assurance check list forms.
4
Configuration and Change Management Policies
All projects will have to adopt the project management office (PMO) change control system
process and procedures. Project change requests go through the process and approval of the
change control board (CCB).
PMO’s change control system is a formal process with documented procedures that defines
how a project Scope Statement (original, defined, and signed by project sponsors) must be
maintained when the need for changes occur. The process includes steps by which the official
Project Scope Statement document may be changed. The process also includes all
electronic/paperwork tracking systems, processes, and approval levels necessary for
authorizing changes.
Concept Map of PMO Change Control Tools and Techniques (Project
Management Institute, 2004)
TOOLS and TECHNIQUES
*Scope Change Control
*Performance Measurement
*Additional Planning
INPUTS
OUTPUTS
*WBS
*Performance
Reports
*Change Requests
*Scope Management
Plan
Scope
Change
Control
*Scope Changes
*Corrective Action
*Lessons Learned
*Adjusted Baseline
Completing a change-request form template is a requirement for this process. User (Change)
requests are submitted to the change control board (CCB) for approval.
5
Change Request Form Template
Project Name:
Date Request Submitted:
Title of Change Request
Change Order Number:
Submitted by: (name and contact information)
Change Category:
Scope
Schedule
Cost Technology Other
Description of change requested:
Events that made this change necessary or desirable:
Justification for the change/why it is needed/desired to continue/complete the project:
Impact of the proposed change on:
Scope:
Schedule:
Cost:
Staffing:
Risk:
Other:
Suggested implementation if the change request is approved:
Required approvals:
Name/Title
Date
Approve/Reject
References
Project Management Institute. (2004). A guide to the project management book of knowledge
(3rd ed.). Newtown Square, PA: Author.
Schwalbe, K. (2007). Information technology project management (5th ed.). Boston: Thomson.
6
Project Charter
Project Title: New Employee Orientation
Project Start Date: 10/09/2007 Projected Finish Date: 01/22/2008
Budget Information: $25,000.00
Project Manager: Jeremy Lee JLee@nearlyfree.com ext 8000
Project Objectives
To build an employee orientation learning module for the Human Resource department.
It will be accessed through the company Intranet. This module will include at least one
quiz and a signoff to document that new employees have completed their orientation and
understood the training information.
Approach
The following is a list of milestones which represent success on this project
• Kickoff meeting.
• Requirements and Project Planning.
• Design and Development.
• Testing.
• User Testing.
• Stakeholder testing and presentation.
• Design changes based upon testing information.
• Final Integration Testing.
• Roll out.
• Project Close.
Roles and Responsibilities
Role
Name
Organization /
Position
Contact Information
Project sponsor
Jennifer Beal
Project Sponsor
E-mail: jbeal@nearlyfree.com
Phone: X8999
Project manager
Jeremy Lee
Project Manager
E-mail: jlee@nearlyfree.com
Phone: X8000
Team resource
Alice Yee
Software Specialist
E-mail: ayee@nearlyfree.com
Phone: X8888
Page 1 of 2
Team resource
Tom Johansen
Webmaster
E-mail: tjoh@nearlyfree.com
Phone: X8777
Team resource
John Sachs
QA Administrator
E-mail: jsac@nearlyfree.com
Phone: X8666
Cheryl
Gladstone
HR Manager
E-mail: cgla@nearlyfree.com
Phone: X8555
Sign-off: The stakeholders initialed their names in table above.
Comments: None.
Page 2 of 2
Quality Statement
To:
Jennifer Beal, Alice Yee, Cheryl Gladstone, John Sachs, and Tom Johansen
From: Jeremy Lee
Re:
NearlyFree.com NEO Project Quality Statement
PMO Quality Management Discipline and Policies
The PMO upholds the IT Service Oriented Architecture and Enterprise which is the basic
framework and structure for all IT-related activities and projects. The philosophy is service,
centered on customer satisfaction and quality.
NEO Project will implement and abide by the PMO Quality Policies. Quality Policies will be
implemented from the planning phase and throughout the different project phases to project
close.
Ensuring Process Quality
Attention will be given to detailed documentation of the development process.
Program code test and review meetings will be scheduled regularly to make the processes flow
run smoothly and eliminate any misunderstandings from the team.
Exit phase meetings will be scheduled for documentations and lessons learned for future use.
Internal audits will be performed regularly. These are done not only for IT processes, but also
for Finance and Human Resources as well.
Quality Control
Testing Techniques
•
•
•
Expert Review
Inspections
Audits
Testing Cycles
•
•
•
•
Unit testing
Integration testing
System testing
User acceptance testing
Conclusion
Page 1 of 2
NEO Project will comply with the PMO quality policies and guidelines. The Project Manager will
make sure all the project team and all resources are in compliance with these strict policies and
guidelines.
Jeremy Lee
Signed by PM
Page 2 of 2
Project Scope Statement
Version History
1.01.0
10/25/2007
Project Name:
Project NEO
Prepared by:
Jeremy Lee
Date (MM/DD/YYYY):
10/25/2007
approved Project Scope
Executive Summary
The Scope of this project is to design an employee orientation module as requested by the
Human Resource department to be used for new employee orientation. The information needs
to be accessed through the company Intranet where new employees would review all company
policies, take a quiz, and sign off on the new employee orientation process. The scope also
includes successful testing and acceptance by the Human Resource department.
Business Objectives
2.1 Product Description (Solution)
A NearlyFree.com New Employee Orientation Module for the Human Resource department will
be designed that can be accessed using the company Intranet for new employee orientations.
During the orientation process, new employees will review the presentation presented by
Human Resources followed by a quiz and sign off the orientation process.
2.2
Business Objectives
The Human Resource department would like to automate the new employee orientation process
by providing electronic documentation for orientation presentations, and maintain this database
to track and document successfully completed orientations.
Project Description
Project Scope
3.1 Project Scope
Includes (list Deliverables):
• Design a web based Human Resource module for new employee orientations.
• Integrate HR module with the company Intranet.
Page 1 of 5
•
•
•
•
•
Migrate existing hard copy presentations into electronic format.
Create quiz to assess new employees on their understanding of HR processes.
Create electronic sign-off for a successfully completed orientation.
Create online help to assist new employees during the orientation process.
Provide documentation to the Human Resource department to help with future changes
to the orientation material.
Does Not Include
The scope of this project does not include anything that is not maintaining the website
3.2 External Dependencies
All project requirements including the hard copy documents of the orientation material to be
promptly provided by Cheryl Gladstone.
3.3 Assumptions
All necessary hardware and software is already in place. The NearlyFree.com Employee
Orientation module will be created and integrated into the Human Resource section of the
Intranet.
3.4 Constraints
No new requirements to be added by the sponsors without affecting the project timeline and
budget.
Project Milestone
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Milestone
Target Date
Project Start
Project Charter
Work Breakdown Structure
Project Scope Statement
Project Schedule
Responsibility Assignment Matrix
Project Schedule Resources
Project Cost Estimate
Project Quality Statement
Stakeholder Analysis
Communication Plan
Risk Matrix
Final Project Plan
Software Orientation Learning Module Complete
Final Integration Testing Complete
10/09/2007
10/09/2007
10/19/2007
10/26/2007
11/01/2007
11/06/2007
11/09/2007
11/16/2007
11/23/2007
11/28/2007
11/30/2007
12/07/2007
12/13/2007
1/18/2008
1/17/2008
Page 2 of 5
•
•
•
•
Documentation provided to Human Resource department
Training Human Resource on new module complete
Project Complete
Post Mortem Lessons Learned
1/21/2008
1/21/2008
1/21/2008
1/22/2008
Project Approach
Standard
5.1 Primary Plans
The nearlyfree.com project will have the following formal written plans:
• Project schedule. A firm schedule of events will be provided when all the requirements
have been satisfactorily met.
• Cost Estimate. Cost estimates will also be provided when all requirements are met.
• Responsibility Assignment Matrix.
• Quality Statement. A list of quality objectives is provided in the Quality Statement.
• Communication Plan. A spreadsheet of the communication plan is provided in the
Communication Management Section.
• Risk Analysis. A probability of risk associated with the project will be provided.
• Change Management. The change control procedures are included in the project plan.
Project-Specific
Briefly describe how each of the following will be handled. Provide links to relevant documents
as appropriate. Modify example text provided or enter your own.
5.2 Change Management
The change control procedures as documented in the Change Management Plan will
be consistent with the Project Management Methodology and consist of the following processes:
• A Change Request Log will be established by the Project Manager to track all changes
associated with the project effort.
• All Change Requests submitted via Change Request Form will be assessed to
determine possible alternatives and costs.
• Change Requests will be reviewed and approved by the project owner.
• The effects of approved Change Requests on the scope and schedule of the project will
be reflected in updates to the Project Plan.
• The Change Request Log will be updated to reflect current status of Change Requests.
5.3 Communication Management
The following strategies have been established to promote effective communication within and
about this project. Specific Communication policies will be documented in the
Communication Plan.
Page 3 of 5
•
•
•
•
•
The Project Manager will present project status to the project Sponsors on a weekly
basis; however, ad hoc meetings will be established at the Project Manager’s discretion
as issues or change control items arise.
The Project Manager will provide a written status report to the project Sponsors on a
monthly basis and distribute the Project Team meeting minutes.
The project Sponsors will be notified via e-mail of all urgent issues. Issue notification will
include time constraints, and impacts, which will identify the urgency of the request for
service.
The Project Team will have weekly update and status meetings to review completed
tasks and determine current work priorities. Minutes will be produced from all meetings.
All electronic Project Documents will be maintained in central storage accessible by all
project stakeholders.
5.4 Resource Management
The project team will produce a Resource Management Plan that will document the following:
• Lists all major goods and services required in the project along with cost estimates and
quality information.
• Indicates which goods and services will be obtained from sources outside the
Organization.
• Indicates who is assigned to the project and when.
Authorizations
The Scope Statement is approved by the:
• Project Sponsor
Jennifer Beal
• Project Manager
Jeremy Lee
Project performance baseline changes will be approved by the:
• Project Sponsor
Jennifer Beal
• Project Manager
Jeremy Lee
Project deliverables will be approved or accepted by the:
• Project Sponsor
Jennifer Beal
• Key Stakeholders
Cheryl Gladstone
Specific task responsibilities of project resources will be defined in the Responsibility
Assignment Matrix.
Project Scope Statement Approval / Signatures
Project Name:
NEO Project
Project Manager:
Jeremy Lee
The purpose of this document is to provide a vehicle for documenting the initial planning efforts
for the project. It is used to reach a satisfactory level of mutual agreement between the Project
Page 4 of 5
Manager and the Project Sponsors and Owners with respect to the objectives and scope of the
project before significant resources are committed and expenses incurred.
I have reviewed the information contained in this Project Scope Statement and agree:
Name
Role
Signature
Date
Jeremy Lee
Project Manager
e-sig
11/01/2007
Jennifer Beal
Project Sponsor
e-sig
11/01/2007
Cheryl Gladstone
HR Manager
e-sig
11/01/2007
The signatures above indicate an understanding of the purpose and content of this document by
those signing it. By signing this document, they agree to this as the formal Project Scope
Statement document.
Page 5 of 5
...
Purchase answer to see full
attachment
CATEGORIES
Economics
Nursing
Applied Sciences
Psychology
Science
Management
Computer Science
Human Resource Management
Accounting
Information Systems
English
Anatomy
Operations Management
Sociology
Literature
Education
Business & Finance
Marketing
Engineering
Statistics
Biology
Political Science
Reading
History
Financial markets
Philosophy
Mathematics
Law
Criminal
Architecture and Design
Government
Social Science
World history
Chemistry
Humanities
Business Finance
Writing
Programming
Telecommunications Engineering
Geography
Physics
Spanish
ach
e. Embedded Entrepreneurship
f. Three Social Entrepreneurship Models
g. Social-Founder Identity
h. Micros-enterprise Development
Outcomes
Subset 2. Indigenous Entrepreneurship Approaches (Outside of Canada)
a. Indigenous Australian Entrepreneurs Exami
Calculus
(people influence of
others) processes that you perceived occurs in this specific Institution Select one of the forms of stratification highlighted (focus on inter the intersectionalities
of these three) to reflect and analyze the potential ways these (
American history
Pharmacology
Ancient history
. Also
Numerical analysis
Environmental science
Electrical Engineering
Precalculus
Physiology
Civil Engineering
Electronic Engineering
ness Horizons
Algebra
Geology
Physical chemistry
nt
When considering both O
lassrooms
Civil
Probability
ions
Identify a specific consumer product that you or your family have used for quite some time. This might be a branded smartphone (if you have used several versions over the years)
or the court to consider in its deliberations. Locard’s exchange principle argues that during the commission of a crime
Chemical Engineering
Ecology
aragraphs (meaning 25 sentences or more). Your assignment may be more than 5 paragraphs but not less.
INSTRUCTIONS:
To access the FNU Online Library for journals and articles you can go the FNU library link here:
https://www.fnu.edu/library/
In order to
n that draws upon the theoretical reading to explain and contextualize the design choices. Be sure to directly quote or paraphrase the reading
ce to the vaccine. Your campaign must educate and inform the audience on the benefits but also create for safe and open dialogue. A key metric of your campaign will be the direct increase in numbers.
Key outcomes: The approach that you take must be clear
Mechanical Engineering
Organic chemistry
Geometry
nment
Topic
You will need to pick one topic for your project (5 pts)
Literature search
You will need to perform a literature search for your topic
Geophysics
you been involved with a company doing a redesign of business processes
Communication on Customer Relations. Discuss how two-way communication on social media channels impacts businesses both positively and negatively. Provide any personal examples from your experience
od pressure and hypertension via a community-wide intervention that targets the problem across the lifespan (i.e. includes all ages).
Develop a community-wide intervention to reduce elevated blood pressure and hypertension in the State of Alabama that in
in body of the report
Conclusions
References (8 References Minimum)
*** Words count = 2000 words.
*** In-Text Citations and References using Harvard style.
*** In Task section I’ve chose (Economic issues in overseas contracting)"
Electromagnetism
w or quality improvement; it was just all part of good nursing care. The goal for quality improvement is to monitor patient outcomes using statistics for comparison to standards of care for different diseases
e a 1 to 2 slide Microsoft PowerPoint presentation on the different models of case management. Include speaker notes... .....Describe three different models of case management.
visual representations of information. They can include numbers
SSAY
ame workbook for all 3 milestones. You do not need to download a new copy for Milestones 2 or 3. When you submit Milestone 3
pages):
Provide a description of an existing intervention in Canada
making the appropriate buying decisions in an ethical and professional manner.
Topic: Purchasing and Technology
You read about blockchain ledger technology. Now do some additional research out on the Internet and share your URL with the rest of the class
be aware of which features their competitors are opting to include so the product development teams can design similar or enhanced features to attract more of the market. The more unique
low (The Top Health Industry Trends to Watch in 2015) to assist you with this discussion.
https://youtu.be/fRym_jyuBc0
Next year the $2.8 trillion U.S. healthcare industry will finally begin to look and feel more like the rest of the business wo
evidence-based primary care curriculum. Throughout your nurse practitioner program
Vignette
Understanding Gender Fluidity
Providing Inclusive Quality Care
Affirming Clinical Encounters
Conclusion
References
Nurse Practitioner Knowledge
Mechanics
and word limit is unit as a guide only.
The assessment may be re-attempted on two further occasions (maximum three attempts in total). All assessments must be resubmitted 3 days within receiving your unsatisfactory grade. You must clearly indicate “Re-su
Trigonometry
Article writing
Other
5. June 29
After the components sending to the manufacturing house
1. In 1972 the Furman v. Georgia case resulted in a decision that would put action into motion. Furman was originally sentenced to death because of a murder he committed in Georgia but the court debated whether or not this was a violation of his 8th amend
One of the first conflicts that would need to be investigated would be whether the human service professional followed the responsibility to client ethical standard. While developing a relationship with client it is important to clarify that if danger or
Ethical behavior is a critical topic in the workplace because the impact of it can make or break a business
No matter which type of health care organization
With a direct sale
During the pandemic
Computers are being used to monitor the spread of outbreaks in different areas of the world and with this record
3. Furman v. Georgia is a U.S Supreme Court case that resolves around the Eighth Amendments ban on cruel and unsual punishment in death penalty cases. The Furman v. Georgia case was based on Furman being convicted of murder in Georgia. Furman was caught i
One major ethical conflict that may arise in my investigation is the Responsibility to Client in both Standard 3 and Standard 4 of the Ethical Standards for Human Service Professionals (2015). Making sure we do not disclose information without consent ev
4. Identify two examples of real world problems that you have observed in your personal
Summary & Evaluation: Reference & 188. Academic Search Ultimate
Ethics
We can mention at least one example of how the violation of ethical standards can be prevented. Many organizations promote ethical self-regulation by creating moral codes to help direct their business activities
*DDB is used for the first three years
For example
The inbound logistics for William Instrument refer to purchase components from various electronic firms. During the purchase process William need to consider the quality and price of the components. In this case
4. A U.S. Supreme Court case known as Furman v. Georgia (1972) is a landmark case that involved Eighth Amendment’s ban of unusual and cruel punishment in death penalty cases (Furman v. Georgia (1972)
With covid coming into place
In my opinion
with
Not necessarily all home buyers are the same! When you choose to work with we buy ugly houses Baltimore & nationwide USA
The ability to view ourselves from an unbiased perspective allows us to critically assess our personal strengths and weaknesses. This is an important step in the process of finding the right resources for our personal learning style. Ego and pride can be
· By Day 1 of this week
While you must form your answers to the questions below from our assigned reading material
CliftonLarsonAllen LLP (2013)
5 The family dynamic is awkward at first since the most outgoing and straight forward person in the family in Linda
Urien
The most important benefit of my statistical analysis would be the accuracy with which I interpret the data. The greatest obstacle
From a similar but larger point of view
4 In order to get the entire family to come back for another session I would suggest coming in on a day the restaurant is not open
When seeking to identify a patient’s health condition
After viewing the you tube videos on prayer
Your paper must be at least two pages in length (not counting the title and reference pages)
The word assimilate is negative to me. I believe everyone should learn about a country that they are going to live in. It doesnt mean that they have to believe that everything in America is better than where they came from. It means that they care enough
Data collection
Single Subject Chris is a social worker in a geriatric case management program located in a midsize Northeastern town. She has an MSW and is part of a team of case managers that likes to continuously improve on its practice. The team is currently using an
I would start off with Linda on repeating her options for the child and going over what she is feeling with each option. I would want to find out what she is afraid of. I would avoid asking her any “why” questions because I want her to be in the here an
Summarize the advantages and disadvantages of using an Internet site as means of collecting data for psychological research (Comp 2.1) 25.0\% Summarization of the advantages and disadvantages of using an Internet site as means of collecting data for psych
Identify the type of research used in a chosen study
Compose a 1
Optics
effect relationship becomes more difficult—as the researcher cannot enact total control of another person even in an experimental environment. Social workers serve clients in highly complex real-world environments. Clients often implement recommended inte
I think knowing more about you will allow you to be able to choose the right resources
Be 4 pages in length
soft MB-920 dumps review and documentation and high-quality listing pdf MB-920 braindumps also recommended and approved by Microsoft experts. The practical test
g
One thing you will need to do in college is learn how to find and use references. References support your ideas. College-level work must be supported by research. You are expected to do that for this paper. You will research
Elaborate on any potential confounds or ethical concerns while participating in the psychological study 20.0\% Elaboration on any potential confounds or ethical concerns while participating in the psychological study is missing. Elaboration on any potenti
3 The first thing I would do in the family’s first session is develop a genogram of the family to get an idea of all the individuals who play a major role in Linda’s life. After establishing where each member is in relation to the family
A Health in All Policies approach
Note: The requirements outlined below correspond to the grading criteria in the scoring guide. At a minimum
Chen
Read Connecting Communities and Complexity: A Case Study in Creating the Conditions for Transformational Change
Read Reflections on Cultural Humility
Read A Basic Guide to ABCD Community Organizing
Use the bolded black section and sub-section titles below to organize your paper. For each section
Losinski forwarded the article on a priority basis to Mary Scott
Losinksi wanted details on use of the ED at CGH. He asked the administrative resident